Tender Results of Natural England

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date28 Jan 2025
Contract AmountGBP 12.1 K (USD 16.1 K)
Operationalisation of prototype geospatial query and reporting database/tool-Operationalisation of prototype geospatial query and reporting database/tool

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date27 Jan 2025
Contract AmountGBP 25.5 K (USD 33.4 K)
Supply of 60 x single units of MCERTS certified LoRaWAN enabled Outdoor Air Quality Monitors-To provide Outdoor Air Quality Monitors - 60 single units for delivery to Natural England Norwich office during the week of 25 November 2024. Units to be weatherproof, with long-life battery and/or solar power unit included in per unit cost. Capable of providing data including temperature, relative humidity, particulate matter, CO2, ozone, CH2O, CO, NO2, H2S, SO2 , O2 , volatile organic compounds and barometric pressure. MCERTS Certified, EN 15267 compliant particulate matter sensor. ...

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date23 Jan 2025
Contract AmountGBP 10 K (USD 13.4 K)
Flail collector/ Hi-tip Mower-The Castle Eden Dene NNR team has a requirement for a small heavy duty contractor flail collector for use on its suite of reserves, to help with the effective management of grassland restoration projects on grassland SSSI. Ideally the mower will be suitable for use with a compact tractor and have the option of wheels to support the unit whilst cutting. Note: there is a requirement for the machine to be able to cut vegetation at a height of around 300mm, hence the need for supporting wheels (t...

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date23 Jan 2025
Contract AmountGBP 20.8 K (USD 25.8 K)
RDE764 Projects for Nature Pilot Evaluation - final phase-Evaluating a Defra-led pilot, Projects for Nature, that seeks to generate corporate funding for nature recovery projects through providing a match-making platform and concierge service. This contract will cover the evaluation of the final 6months of the pilot phase.

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date20 Jan 2025
Contract AmountGBP 15 K (USD 20.3 K)
Mechanical control of scrub at Saltfleetby-Theddlethorpe Dune NNR-Site location: Churchill south, Saltfleetby-Theddlethorpe Dunes National Nature Reserve Brief Methodology c.500 metres of ground preparation through scrub clearance and for installation of a new fence line (not included in specs) by root pulling, chain sawing and burning on the brash. and 2 (ha) of steep bank copes of scrubs map available on demande. The contractor is to advise the best suitable route, and the map location is only an indication of the preferred line. When pulling the ...

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date20 Jan 2025
Contract AmountGBP 36 K (USD 47.1 K)
Underground Ordinance watching briefs for England Ecosystem Survey 2025-The overall aim of the contract is to provide UXO (Unexploded Ordnance) engineer watching briefs during the execution of the EES soil survey on selected surveys sites, where this has been recommended, as a safety precaution to ensure safety and compliance with regulatory standards. The UXO risk assessments desk studies have been completed for the sites and will be provided. The UXO team's primary role is to monitor operations, identify potential hazards, and respond to any UXO discoveries d...

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date20 Jan 2025
Contract AmountGBP 14.2 K (USD 19 K)
Guidance on how to identify the Affected Roads Network for HRA purposes-Guidance on how to identify the Affected Roads Network for HRA purposes

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date20 Jan 2025
Contract AmountGBP 16.6 K (USD 21.6 K)
Section 38 Rewetting Works by bunding balance- pipe and dam installation-Summary of the S38 rewetting project Fenn's NNR Section 38, Reeves' Fields, is in the West Midlands near Whitchurch and Wrexham. It is situated towards the southeastern perimeter of the internationally important Fenn's, Whixall, Bettisfield, Wem and Cadney Mosses Site of Special Scientific Interest (S.S.S.I.), in the Fenn's, Whixall & Bettisfield Mosses National Nature Reserve (N.N.R.). The Marches Mosses BogLIFE Project (LIFE15NAT/UK/000786) terminated in March 202...

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date20 Jan 2025
Contract AmountGBP 10 K (USD 13.4 K)
Sussex Woods Pilot - Diet Analysis Study-To carry out eDNA analysis & metabarcoding of 200 no. deer stomach content samples to determine dietary composition to individual plant species level. Work required includes all sample preparation, lab processing, bioinformatics analysis and reporting.

Natural England Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Contract Date13 Jan 2025
Contract AmountGBP 10 K (USD 13.1 K)
Moss Side Farm Pond Field Works Phase 1-Peatland Restoration Works in one field on Moss Side Farm on the Chat Moss peat extent in Greater Manchester. Deep trench bunding, soil inversion to create bog habitat, drain creation and pond creation.
31-40 of 579 active Tender Results