Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
EPIC FOR MITIGATION OF BURN PITS IN DUKHAN-The objective of this project is to ensure compliance with MoE guidelines on reducing pollution and improving safety levels. In addition, it is also required to upgrade the existing Flare systems at all Khuff WHTP's to comply with MoE guidelines and QP corporate philosophy for fire and safety.
Contract Date30 Aug 2012
Contract AmountQAR 96.5 Million (USD 26.5 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
SUPPLY, INSTALLATION, INTEGRATION, M&S OF CITRIX NETSCALER-The present Citrix maintenance and support contract will expire by Q1 - 2012. The contract provided QP with access to Citrix resources like patches/fixes, support coverage, first level maintenance and free upgrades to ensure high availability of services. In addition QP is in the process of providing Citrix services from DR site as part of QP business continuity plan. The provisioning of services in DR will require procurement of Citrix NetScaler and replacing the two existing Access Gateway appliances in RAA with Citrix NetScaler. Above requirements necessitate to carry out an upgrade of Citrix infrastructure and renew maintenance contract for further 3 ½ years (42 Months) for ensuring high availability of services.
Contract Date1 Aug 2012
Contract AmountQAR 1.7 Million (USD 481.3 K)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
ECS FOR AUDITORIUM BUILDING AT RAS LAFFAN-Auditorium Building will provide functional support to facilities that are currently being prepared under contract GC1012800 (EPIC). This facility includes an office, central plant, clinic, central plant, substation, helipad and infrastructure. ECs Contractor shall carry out engineering consultancy services and related services for an all inclusive state of the art Auditorium Building in Ras laffan. The Main spaces for the Auditorim will consist of a 200 person Auditorium and separate Banquet Hall, warming kitchen, VIP rooms, staff offices, storage, workshops, and parking
Contract Date1 Jul 2012
Contract AmountQAR 3.4 Million (USD 940.9 K)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
EPIC FOR REPLACEMENT OF EMERGENCY GENSET IN NGL-1 PLANT,GAS OPERATIONS,MESAIEED-Contractor shall carry out engineering, procurement, installation, construction, pre-commissioning, commissioning, and testing of one (1) new Genset complete with all accessories, Load Transfer Distribution Panel and Diesel Storage Tank for replacement of the existing Genset DG1301 in NGL-1 Plant for Gas Operations, Mesaieed.
Contract Date17 Jun 2012
Contract AmountQAR 989.6 K (USD 271.8 K)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
REHABILIATION OF 83 NOS. STORAGE TANKS, SPHERES & BULLETS AT QP REFINERY MES.-REHABILITATION OF 83 NOs. STORAGE TANKS, SPHERES & BULLETS FOR A PERIOD OF SIX (6) YEARS, AT QP REFINERY, MESAIEED: The Rehabilitation brief Scope of Work shall include; to supply and to perform all Project Management, supervision, personnel, services, materials, mobilization / de-mobilization, Inspection and N
Contract Date1 May 2012
Contract AmountQAR 229.6 Million (USD 63 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
EPIC OF PHASE 1 OF NEW NGL SUPPORT CAMPUS AT MESAIEED-EPIC of full infrastructure services (approx. 0.32 km2 of plot area) including but not limited to earthworks, site grading, road networks, sewerage, site drainage, utility networks, utility tie-ins for buildings and control systems and all related utility structures. EPIC of buildings including but not limited to Clinic Building (5000 m2 built up area), Fire Station Administration Building (7500 m2 built up area), Fire Engine Shelter Building (4000 m2 built up area), Fire Training Area (37000 m2 yard area), Telecommunications/IT Buildings (2 nos), Substation Buildings (4 nos), Security Guard Houses (3 nos) and Contractors Lay-Down Area.
Contract Date18 Apr 2012
Contract AmountQAR 470.8 Million (USD 129.2 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
EPIC FOR 16'' JET A1 PIPELINE FROM QP REFINERY TO BSV-3-"EPIC of 16'' Jet A1 Fuel P/L from QP Refinery to BSV-3" Engineering, procurements/supply & construction of a dedicated system for the supply of JET A1 fuel from QP Refinery to BSV-3 by 16 inch dia. pipeline. The estimated length of the pipeline between QP Refinery and BSV-3 is about 36.0 km. The system also includes new pumping system (3 nos. Booster pumps & 3 nos. Mainline pumps will be installed in a new pump house inside QP-Refinery) & associated facilities. Jet A1 Fuel is currently transported by a multi-product transfer system consisting of a pump station at the QP Refinery in Mesaieed, a 12 inch multi-product pipeline and a tank farm at Doha Depot situated in the Abu Hamour area on the southern outskirts of the city of Doha, via intermediate station BSV-3. From Doha Depot, it is transported to the existing airport by tankers. A new 18 inch multi-product pipeline, currently under pre-commissioning, will be used to transfer multi-products to Doha Depot. A new 16" Jet A1 Fuel pipeline from BSV-3 to STATION C-1 INSIDE NDIA is under EPIC stage and it is being constructed under contract ref. GC09106100 by DOPET. Under this contract, QP is laying an estimated 16.5 km of 16 inch internally and externally coated buried pipeline from BSV-3 to STATION C-1 INSIDE NDIA including temporary Pig Launching facility and Tie-in to existing 12 inch multi-product pipeline at BSV3 & pig receiving facilities, filtration, separation, metering facilities with Satellite and Equipment room at STATION C-1 INSIDE NDIA. Since the condition of existing 12 inch multi-product pipeline from QP Refinery to BSV-3 is not known, QP has decided to lay the proposed new approximately 36 KM long & 16'' dia. Jet A1 pipeline from QP Refinery (at Mesaieed) to BSV-3. Based on the above, purchase order has already been placed by QP for 16" line pipe API 5LX 60, 7.9 mm wall thickness for the Jet A1 Fuel pipeline project. The line pipe will be Free Issue Material for the EPIC Contractor.
Contract Date26 Feb 2012
Contract AmountQAR 116.9 Million (USD 32 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
PROVISION OF WIRELINE EQUIPMENT & SERVICES FOR O-CONTRACTOR shall supply all labour, services, supervision, testing, tools, Inspections, maintenance, repair, redress, transportation, and each and every item necessary for the carrying out wireline operations/SERVICES in all vertical & deviated wells in the Onshore and Offshore QP-operated fields, as and when required by QP on Call-Off basis during a period of thirty-six (36) months
Contract Date1 Dec 2011
Contract AmountQAR 150.8 Million (USD 41.4 Million)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
PUR, IMPL, MAINT, UPGR AND TRAIN OF HP(QC-QTP)-The services including Purchase, implementation, maintenance, upgrade and training of HP Quality Center(HP QC)& HP QuickTest Professional (HP QTP)
Contract Date11 Sep 2011
Contract AmountQAR 635.3 K (USD 174.5 K)

Qatarenergy Tender Result

Result Stage: Awarded  (AOC Available)
Qatar
CALL OFF CONTRACT FOR REPAIR OF CRUDE OIL TANKS AT HALUL-Call off Contract for emergency Repair of Crude Oil Tanks at Halul Island. Release Order shall be issued to Contractor stating all the necessary activities to be carried out at each stage of the repair of each tank. Contract Duration:04 years Start Date:22/08/2010
Contract Date26 Jun 2011
Contract AmountQAR 44 Million (USD 12.1 Million)
6761-6770 of 6811 active Tender Results