Locker Tender Results
Locker Tender Results
East Coast Railway - ECOR Tender Result
Paints and Enamels
Ireps
India, India
Contract Date31 May 2024
Contract AmountINR 275.8 K (USD 3.3 K)
Description: 25218049: Anaerobic Adhesives used for application such as thread locking of Bolts and Nuts, studs, screws
Northern Railway - NR Tender Result
Electrical Goods and Equipments...+1Electrical and Electronics
Ireps
India
Contract Date31 May 2024
Contract AmountINR 870.8 K (USD 10.4 K)
Supply And Testing Of Portable Lighting Mast With 100 W, 230 V, 50 Hz Led Flood Lights, 04 Nos. Fittings (with 5 Years Warranty From Oem)confirming To Cee/nr's Specification No. Pceenr/121-elect/ps/2019(rev-'4') Dated 4.11.2019 And To Be Fitted On 6 Meters Height Portable Telescopic Mast Of 6 Meters Height Made Out Of Aluminum Alloy Hollow Sections Of Minimum 50 Mm, 38mm And 25mm Od. The System Would Have A Spring Loaded Locking Arrangement Which Would Automatically Lock The Inner Pipe When Extended To The Full Height. Another Locking Arrangement Should Be Provided So That The Telescopic Stand Can Be Locked At Any Required Height Between 2, 4 And 6 Meters. The Base Would Be So Design To Ensure That Telescopic Stand When Fitted On It Acts Like A Self Supporting Free Standing Type Unit. The Light Cradle Would Be Made From Hollow Pipe/ Rectangular Sections And Should Have Arrangement To Install Up To 4 Nos 1 X 100w Led Flood Light Fittings.detailed Specifications As Per Anexure 'a.
DEPT OF THE NAVY USA Tender Result
United States
Contract Date31 May 2024
Contract AmountUSD 2.3 Million
Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001|20 Ea.|550 ||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|a|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n
/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil |
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (feb 2024)|13|332919|750||||||||||||
type Of Contract (apr 1984)|1|firm Fixed|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
dd1423 Data Item A001 May Be Waived If Already On File Atnavsup Wss Mechanicsburg.
any Contract Awarded As A Result Of This Solicitation Will Be Do Rated Order Certified Forfornational Defense Use Under The Defense Priorities And Allocations System (dpas).
if Drawings Are Included In The Solicitation, Access Needs To Berequested On The Individual Solicitation Page On Contracts Opportunities On The Governments Sam Website. Afterrrequesting Access, Send An Email To The Primary Poc Listed On The Solicitation.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;4384676 - Confidential;
2.3 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.3.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.3.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.3.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
drawing Data=eb-2000 |96169| B|sp |d|0001 | B|49998|0023467
drawing Data=eb-2000 |96169| B|sp |d|0002 | B|49998|0025267
drawing Data=eb-2000 |96169| B|sp |d|0003 | B|49998|0006121
drawing Data=eb-2000 |96169| B|sp |d|0004 | B|49998|0028838
drawing Data=eb-2000 |96169| B|sp |d|0005 | B|49998|0017832
drawing Data=eb-2000 |96169| B|sp |d|0006 | B|49998|0025093
drawing Data=eb-2000 |96169| B|sp |d|0007 | B|49998|0018998
drawing Data=eb-2000 |96169| B|sp |d|0008 | B|49998|0022687
drawing Data=eb-2000 |96169| B|sp |d|0009 | B|49998|0025541
drawing Data=eb-2000 |96169| B|sp |d|0010 | B|49998|0008084
drawing Data=4384676 |53711| C| |d|0001 | C|00026|0000000
drawing Data=7016077 |53711| B| |d|0001 | B|49998|0175546
drawing Data=7016077 |53711| B| |d|0002 | B|49998|0144180
drawing Data=7016077 |53711| B| |d|0003 | B|49998|0157797
drawing Data=7016077 |53711| B| |d|0004 | B|49998|0219730
drawing Data=7016077 |53711| B| |d|0005 | B|49998|0175065
drawing Data=7016077 |53711| B| |d|0005.1 | B|49998|0433181
drawing Data=7016077 |53711| B| |d|0006 | B|49998|0137035
drawing Data=7016077 |53711| B| |d|0007 | B|49998|0114084
drawing Data=7016077 |53711| B| |d|0008 | B|49998|0149567
drawing Data=7016077 |53711| B| |d|0009 | B|49998|0121920
drawing Data=7016077 |53711| B| |d|0010 | B|49998|0169937
drawing Data=7016077 |53711| B| |d|0011 | B|49998|0102221
drawing Data=7016077 |53711| B| |d|0012 | B|49998|0076363
drawing Data=7016077 |53711| B| |d|0013 | B|49998|0130062
drawing Data=7016077 |53711| B| |d|0013.1 | B|49998|0055906
drawing Data=7016077 |53711| B| |d|0014 | B|49998|0110930
drawing Data=7016077 |53711| B| |d|0015 | B|49998|0157569
drawing Data=7016077 |53711| B| |d|0016 | B|49998|0096892
drawing Data=7016077 |53711| B| |d|0017 | B|49998|0105348
drawing Data=7016077 |53711| B| |d|0018 | B|49998|0079948
drawing Data=7016077 |53711| B| |d|0019 | B|49998|0106131
drawing Data=7016077 |53711| B| |d|0020 | B|49998|0071311
drawing Data=7016077 |53711| B| |d|0021 | B|49998|0091132
drawing Data=7016077 |53711| B| |d|0022 | B|49998|0070819
drawing Data=7016077 |53711| B| |d|0023 | B|49998|0110036
drawing Data=7016077 |53711| B| |d|0024 | B|49998|0103251
drawing Data=7016077 |53711| B| |d|0025 | B|49998|0124278
drawing Data=7016077 |53711| B| |d|0026 | B|49998|0100543
drawing Data=7016077 |53711| B| |d|0027 | B|49998|0139517
drawing Data=7016077 |53711| B| |d|0028 | B|49998|0133775
drawing Data=7016077 |53711| B| |d|0029 | B|49998|0092742
drawing Data=7016077 |53711| B| |d|0030 | B|49998|0077445
drawing Data=7016077 |53711| B| |d|0031 | B|49998|0094077
drawing Data=7016077 |53711| B| |d|0032 | B|49998|0067914
drawing Data=7016077 |53711| B| |d|0033 | B|49998|0094440
drawing Data=7016077 |53711| B| |d|0034 | B|49998|0088128
drawing Data=7016077 |53711| B| |d|0035 | B|49998|0078641
drawing Data=7016077 |53711| B| |d|0036 | B|49998|0075186
drawing Data=7016077 |53711| B| |d|0037 | B|49998|0071460
drawing Data=7016077 |53711| B| |d|0038 | B|49998|0068639
drawing Data=7016077 |53711| B| |d|0039 | B|49998|0078106
drawing Data=7016077 |53711| B| |d|0040 | B|49998|0069474
drawing Data=7016077 |53711| B| |d|0041 | B|49998|0077366
drawing Data=7016077 |53711| B| |d|0042 | B|49998|0082080
drawing Data=7016077 |53711| B| |d|0043 | B|49998|0098311
drawing Data=7016077 |53711| B| |d|0044 | B|49998|0063930
drawing Data=7016077 |53711| B| |d|0045 | B|49998|0139043
drawing Data=7016077 |53711| B| |d|0046 | B|49998|0195681
drawing Data=7016077 |53711| B| |d|0047 | B|49998|0112401
drawing Data=7016077 |53711| B| |d|0048 | B|49998|0188714
drawing Data=7016077 |53711| B| |d|0049 | B|49998|0091075
drawing Data=7016077 |53711| B| |d|0050 | B|49998|0108246
drawing Data=7016077 |53711| B| |d|0051 | B|49998|0085364
drawing Data=7016077 |53711| B| |d|0052 | B|49998|0093309
drawing Data=7016077 |53711| B| |d|0053 | B|49998|0101459
drawing Data=7016077 |53711| B| |d|0054 | B|49998|0081213
drawing Data=7016077 |53711| B| |d|0055 | B|49998|0087062
drawing Data=7016077 |53711| B| |d|0056 | B|49998|0082649
drawing Data=7016077 |53711| B| |d|0057 | B|49998|0077652
drawing Data=7016077 |53711| B| |d|0058 | B|49998|0067483
drawing Data=7016077 |53711| B| |d|0059 | B|49998|0085396
drawing Data=7016077 |53711| B| |d|0060 | B|49998|0068904
drawing Data=7016077b147 |53711| A|er |d|0001 | A|49998|0078803
drawing Data=7016077b147 |53711| A|er |d|0001.1 | A|49998|0071521
drawing Data=7016077b147 |53711| A|er |d|0001.2 | A|49998|0076275
drawing Data=7016077b147 |53711| A|er |d|0001.3 | A|49998|0085170
drawing Data=7016077b147 |53711| A|er |d|0001.4 | A|49998|0082066
drawing Data=7016077b147 |53711| A|er |d|0001.5 | A|49998|0026339
drawing Data=7016077b147 |53711| A|er |d|0001.6 | A|49998|0026274
drawing Data=7016077b147 |53711| A|er |d|0002 | A|49998|0230472
drawing Data=7016077b165 |53711| A|er |d|0001 | A|49998|3807537
drawing Data=7016077b66 |53711| B|er |d|0001 | B|00026|0000000
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b367 | | | |220401|a| | |
document Ref Data=astm-b381 | | | |130701|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;parts Kit For A Size 12 Inch Ball Valve Must Be In Accordance With Naval Ship Systems Command Drawing 845-7016077, Er7016077b66, Er7016077b147, And Er7016077b165 Consisting Of One Ball, Item 116 And One Each Mating Seats, Items 114 And 115, Except As
amplified Or Modified Herein.;
3.2 ;for Seats, Items 114 And 115, Dimension 1.562 Inch Nominal Must Be Manufactured To 1.582 +/- 0.005 Inch. The Stack Height Requirement Of Er7016077b66 Does Not Apply.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;ball, Item 116;
material - Centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplimentary Requirements S6 And S8.
;or
astm-b381, Grade F-5 With The Following Modified Mechanical Properties:
ultimate Tensile Strength - 125,000 Psi Minimum (longitudinal Direction)
elongation In 4d - 10% Minimum
yield Strength - 115,000 Psi Minimum
reduction Of Area Minimum 20%;
part - ;seats, Items 114 And 115 (q3); Material - Mc903 (type 6 Cast Nylon Produced With Polyepsilon Caprolactam By The Direct Polumerization Process) As Manufactured By The Polymer Corporation Or Equal In Accordance With Electric Boat
division Specification 2000. (properties Specified Below Only) Item Property Astm Test Method Value (a) Melting Point D789 221 Deg C +/- 9 (430 Deg F +/- 16) (b) Relative Viscosity D789 1500-6500 (rv Is A Unitless Value, The Rv Test Specimens Must Dissolve Within A 120 Hour Period) (c) Specific Gravity D792 1.15 - 1.17 @ 23 Deg C (73f) (d) Dimensional Change Note 1 .2% Max (e) Tensile Impact D1822 80 Ft-lb/sq In Type S Specimen Minimum Note 3 Note 2
(f) Tensile Yield Stress D638 9,000 Psi Min Note 2 Note 3
(g) Compressive Strength D695 9,000 Pis Min 1% Offset Note 2 Note 3
(h) Water Absorption D570 24 Hr 1.3% Max Saturation 7% Max
notes:
1. The Test Method To Determine Dimensional Stability Must Be Performed As Follows: The Test Specimens Must Be Measured At 23 Deg C +/- 3 (73 Deg F +/- 5) And Placed In A Mineral Oil^ Bath Maintained 184 Deg C +/- 3 (363 Deg F +/- 5). The Specimens Must
remain In The Bath For Six (6) Hours At Temperature And Allowed To Slow Cool In The Bath At A Rate Not To Exceed 23 Deg C +/- 3 (41 Deg F +/- 5) Per Hour. When The Bath Reaches 23 Deg C +/- 3 (73 Def F +/- 5), The Test Specimens Must Be Removed And Measured.
the Percent Change In Each Dimension, Outside Diameter, Inside Diameter And Thickness Must Not Be Greater Than The Value Specified.
^mineral Oil Meets The Specifications As Listed Below:
description..........................passes U.s.p. Test (usp Xx, P.1143)
solubility...........................passes U.s.p. Test (usp Xx, P.1143)
neutrality...........................passes U.s.p. Test (usp Xx, P.532)
readily Corbonizable Substances......passes U.s.p. Test (usp Xx, P.532)
limit Of Polynuclear Compounds.......passes U.s.p. Test (usp Xx, P.532)
solid Parafin........................passes U.s.p. Test (usp Xx, P.532)
specific Gravity @ 25 Deg C (77f)....0.8600 To 0.8900
viscosity @ 37.8 Deg C (100 F).......73.6 To 84.4 Centistokes (340-390 Sus)
flash Point Cleveland Open Cup.......420 Deg F (216 C) (typical)
refractive Index @ 20 Deg C (68f)....1.480 (typical)
2. Prior To Test Specimens Must Be Conditioned As Follows: The Specimens Must Be Subjected To A Temperature Of 71 Deg C +/- 3 (160 Deg F +/- 5) Under A Vacuum To A Maximum Of One Millimeter Absolute Pressure Until A Change Of Less Than .2% Between Two
weighings Sixteen (16) Hours Apart Is Achieved.
3. These Values Are Minimum Averages. Separate Specimen Values May Not Vary More Than 25% Under The Specified Minimum.
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
;test - Hydrostatic Test
item - Each Ball
performance - 30 Minutes At Item 3 Of Drawing 4384676 With Stem Hole Plugged
acceptance - No Weeping, Leakage, Or Permanent Deformation
the Following May Be Substituted By Manufacturers Who Do Not Possess A Hydrostatic Test Fixture:
test - Dye Penetrant Inspection
item - Each Ball
performance - T9074-as-gib-010/271
acceptance - S9074-ar-gib-010a/278 (castings) / Quality Statement For The
procurement Of Forgings (forgings);
3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.6 Alumina-titania/ptfe Coating Of Ball(s) Must Be In Accordance With A & A Company Specification Navy016 Rev L. Each Ball Manufactured/repaired Under This Order Must Be Tagged With A Durable Non-metallic Tag With Thefollowing Statement: "ball Coated With Alumina-titania/ptfe Coating Per A & Acompany, South Plainfield New Jersey, Proprietary Procedure Navy016 Rev L. This Coating Was Approved By Navsea And These Balls Are An Approved Replacement For The Ball, Piece ;2; , Of Naval Ship Systems
command Drawing ;845-7016077; ."
3.7 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;4384676, Revision C; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To Mark The
working Pressure On The Item Does Not Apply And Is Strictly Prohibited.
3.8 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/.
3.9 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must
apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay.
3.10 ;surface Waviness Must Be Verified After Grinding/finishing Of Alumina-titania Coating And Before Ptfe Application. Surface Finish Of The Alumina-titania Coating, Prior To Ptfe Application Must Be 32 Microinches.;
3.11 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.12 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.12.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.12.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.12.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.13 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification
data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.14 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The
contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.20.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.20.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.20.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.20.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.20.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.21 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.21.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices
and For Verification Of Their Accuracy And Condition.
3.21.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.22 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.23 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.23.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.23.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.23.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must
be Established. Records Of This Effort Must Be Available For Review By The Government.
3.23.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.24.2 Inspection For Completeness And Proper Type.
3.24.3 Verification Of Material Quality Received.
3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.24.6 Identification And Protection From Improper Use Or Disposition.
3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.24.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein.
3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The
material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples
must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The
finished Component.
3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.26.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;balls Are To Marked On Top Of The Ball Near The Stem Hole In A Non-working Area. Seats Are To Be Marked On The Outer Cylindrical
surface.;
3.26.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size
scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats.
seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification.
3.26.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.27 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply:
3.27.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As
applicable, Of The Material Supplied.
3.27.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or
composition, As Applicable, Of The Material Supplied.
3.27.3 Re-identification And Re-certification Of Metallic Material Is Required When The Material Is Subjected To A Process Which Alters Its Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical
composition Or Mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A
process Is Used During Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The
altered Material Must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties
are Altered, The Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number _______________ And Heat Treat Number ______________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.27.4 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.27.5 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.27.6 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.28 Material Handling - The Written Material Control Process Must Include The Following:
3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And
marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.29 Receiving Inspection
3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.29.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.30 Discrepancy Reporting
3.30.1 Nonconforming Products Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To The Responsible Sub-tier
supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.31.5 Sampling For Certification Of Non-metallic Material Must Be On The Basis Of One Set Of Test Specimens From Each Heat/lot Or Batch.
3.32 Quality Statement For The Procurement Of Forgings - The Forgings Must Be Free Of Scale And Machining Burrs.
a. All Accessible Surfaces Of The Finished Forging Must Be Magnetic Particle Or Liquid Penetrant Inspected (as Required By The Contract/purchase Order) In Accordance With T9074-as-gib-010/271. Indications Obtained By The Inspection Must Be Evaluated And Must
be Free Of Injurious Imperfections As Defined Below:
depth Of Injurious Imperfections - Linear Imperfections Must Be Explored For Depth. When The Depth Encroaches On The Minimum Wall Thickness Of The Finished Forging, Such Imperfection Must Be Considered Injurious.
any Imperfection Located In Gasket, Bearing Or Machined Surfaces Which Can Cause Leakage Or Otherwise Interfere With Proper Function Of The Component(s).
b. Machining Or Grinding Imperfections Not Classified As Injurious - Surface Imperfections Not Classified As Injurious Must Be Treated As Follows:
seams, Laps, Tears Or Slivers, Not Deeper Than 5 Percent Of The Nominal Wall Thickness Or 1/16 Inch (1.6mm), Whichever Is Less.
mechanical Marks Or Abrasions And Pits Must Be Acceptable, Without Grinding Or Machining, Provided The Depth Does Not Exceed The Limitations Set Forth In Para A Above. Imperfections That Are Deeper Than 1/16 Inch (1.6mm), But Which Do Not Encroach On The
minimum Wall Thickness Of The Forgings Must Be Removed By Grinding To Sound Metal.
when Imperfections Have Been Removed By Grinding Or Machining, The Outside Dimension At The Point Of Grinding Or Machining May Be Reduced By The Amount Removed. Should It Be Impractical To Secure A Direct Measurement, The Wall Thickness At The Point Of
grinding Or At An Imperfection Not Required To Be Removed, Must Be Determined By Deducting The Amount Removed By Grinding From The Nominal Finished Wall Thickness Of The Forging And The Remainder Must Be Not Less Than The Minimum Specified Or Required Wall
thickness.
c. Surface Conditions Noted In Paragraph B Above, Must Be Considered Acceptable Without Weld Repair Provided The Grinding Is Blended Smoothly With The Adjacent Material And Is Scattered And Provided The Total Ground Area Does Not Exceed 10 Percent Of The
forging Surface. All Ground Areas Must Be Reinspected By Magnetic Particle Or Liquid Penetrant Inspections (as Required By The Contract/purchase Order).
d. Injurious Imperfections And Defect Excavations Which Violate The Minimum Required Wall Thickness May Be Weld Repaired In Accordance With S9074-ar-gib-010a/278. Authority For The Repair Of Wrought Or Forged Material Must Be Obtained From The Procurement
contracting Officer. This Request Must Be Submitted On A Dd Form 1694 Describing The Defect, Including Size, Depth, And Location. This Request Must Also Include A Description Of The Proposed Repair.
e. All Weld Repaired Areas Must Be Inspected By Magnetic Particle Or Liquid Penetrant Inspection. Acceptance Criteria Must Be In Accordance With S9074-ar-gib-010a/278.
3.33 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To C
DEPT OF THE NAVY USA Tender Result
United States
Contract Date31 May 2024
Contract AmountUSD 14.6 Million
Contact Information|4|n744.14|ge9|717-605-2541|amber.wale@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001aa|qty 1|330 Days After Date Of Contract|0001ab|qty 1|330 Days After Date Of Contract|0001ac|qty 40|330 Days After Date Of Contract||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Receiving Report And Invoice|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
small Business Subcontracting Plan (oct 2022)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7||||||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (mar 2023)|13|336611|1250||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
type Of Contract (apr 1984)|1|firm Fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data--basic (jan 2023))|1||
the Purpose Of This Amendment Is To Extend Proposal Due Date To 30 Jun 2023.
clauses Are Hereby Updated As Below.
no Other Changes Are Made At This Time.
\
the Purpose Of This Amendment Is To Decrease From The Quantity From 42 Ea To 12 Ea.
the Final Proposal Date Is Extended To 31 Mar 2023.
no Other Changes Are Made At This Time.
\
any Resulting Contract Will Be In Accordance To The Terms & Conditions Of The Basic Ordering Agreement N00104-23-g-zl01.
the Following Provisions And Clauses Are Hereby Added To The Solicitation:
-- Dfars 252.225-7055 (p) And Dfars 252.225-7056 (c)
-- Dfars 252.225-7057 (p) And Dfars 252.225-7058 (c)
far 52.211-8 Is Hereby Updated To Include The Qty 40 Ea From Amendment 0001.
solicitation Remark "since There Is Only One Business Concern Capable Of Manufacturing This Nsn, The Small Business Set-aside Requirement Has Been Dissolved" Is Hereby Removed.
proposal Due Date Is Established As 27 Feb 2023.
all Other Terms And Conditions Remain Unchanged.
\
this Solicitation Is Hereby Amended For Quantity Change From 2 Ea To 42 Ea.
certified Cost And Pricing Data Shall Be Submitted If Proposal Meets The Threshold Of $2,000,000.00. See Dfars 252.215-7009 That Shall Be Completed And Submitted With Proposal.
the Following Clauses Have Been Revised:
-- Wsstermmba00
-- Wsstermmlz06
-- Far 52.219-28
-- Far 52.219-8
-- Far 52.219-9
-- Far 52.244-6
-- Dfars 252.203-7005
the Following Clause Has Been Deleted:
-- Dfars 252.211-7006
proposal Due Date Is 06 Feb 2023.
all Other Terms And Conditions Remain Unchanged.
\
this Rfp Is For A Buy. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
please Submit A Firm Fixed Price Proposal And Any Manufacturing Or Packaging Cage Codes Used.
under Clause Far 52.211-8 Time Of Delivery, The Government Requires Delivery By 330 Days Of Contract Award. This May Be Negotiated At Time Of Award Based On Fleet's Demand.
government Source Inspection Is Required.
all Freight Is Fob Origin.
dfars 252.211-7003 Item Unique Identification And Valuation Is Required.
a Small Business Subcontracting Plan In Required With Proposal That Meets The Threshold Of $750,000.
since There Is Only One Business Concern Capable Of Manufacturing This Nsn, The Small Business Set-aside Requirement Has Been Dissolved.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Seal Assembly,main .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
document Ref Data=mil-std-130 | | |m |051202|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=iso9001 | | | |010417|a| | |
3. Requirements
3.1 ;the Items Critical Interfacing Featurest Must Comply With Latest Most Updated Eb Product Compliance Report For The Item Document Reference H87163 As Noted On Wartsila Drawing Number Us73457-02 For The Following Features Feature No. 1 Item No. -1-1 Item
description Seat Interface Discription Lenght To Shoulder (li) Feature 2 -1-1 Item Seat Interface Hole 0 (h1) Feature 3 -1-1 Item Seat Interface Hole Depth (l2) Feature 4 -1-1 Item Seat Interface Inner O.d. (d1) Feature 5 -1-1 Item Seat Interface Outter O.d.
(d2) Feature 6 -3-1 Item Drive Ringbore 0 Feature 7 -3-2 Item Lock Ring Interface Bore 0 Feature 8 -3-2 Item Lock Ring Interface Lenght Feature 9 -4-1 Item Body Interface Bore 0 Feature 10 -7-1item Shaft Retainer Interface Bore 0 Feature 11 -4-1 Item Body
interface Lenght(l3) Feature 12 -3-1 Item Drive Ring Interface Lenght (l3) The Listed Critical Interfacing Features Must Be Inspected To And Comply With The Eb Product Compliance Report H87163 Latest Most Updated Current Issue Of. 100% Inspection Required For
the Whole Depth Of All Critical "holes".;
3.1.1 ;requirements For Seat Ring Coating: Seat Ring Coating Shall Be Sx314
per Program Executive Officer, Submarines Letter 9250 Ser 450t2ak/0984
dated 14 Dec. 2010;
3.2 Cage Code/reference Number Items - The Seal Assembly,main Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No. ;0eya6 Us73457-02;
3.3 Marking - This Item Shall Be Physically Identified In Accordance With Mil-std-130.
3.4 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Spcc Contracting Officer Has Been Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Or A Detailed Description Of The Change, Explaining The Reason Therefore. If Finished Detail Drawings Are Not Available, Shop Drawings Inthe Form Used By The Manufacturer
will Be Acceptable For Government Evaluation. When Notifying The Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change/minor Design Change - If The Manufacturer's Part Number Or Item Design Indicated Thereon Has Changed, But Form, Fit And Function Of The Item Is Not Affected Thereby, And The Design Change Meets The Criteria For Minor, By Not
effecting Form, Fit, Function, Reliability Or Safety , Supply The Item And Advise Spcc Immediately Of The New Part Number, Furnishing A Detail Drawing And/or A Detailed Description Of The Change, As Applicable.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.5 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Inspection System Requirements - The Supplier Shall Provide And Maintain An Inspection/quality System Acceptable To The Government. The Inspection System Requirements For This Contract/purchase Order Shall Be In Accordance With Mil-i-45208. Suppliers
certified To Perform Under Iso 9001 Or Iso 9002 Are Granted Permission To Utilize The One Desired In Lieu Of Mil-i-45208.
4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
Indian Army Tender Result
Automobiles and Auto Parts...+1Machinery and Tools
GEM
India
Contract Date30 May 2024 This is an estimated contract date, exact date may vary.
Contract AmountRefer Documents
Description: Wheel brake disc assy,Door lock driver side,Bonnet cable,Bonnet lock,Wiper blade and arm
9911-9920 of 10000 active Tender Results