The coup d'état with free hand to the TXU/EEIM/2/2022 of the day 25.01.2022 on the maintenance of 8 road stations in Wrocław along with the maintenance of the GPS network.
The reconstruction and reconstruction of the ul. Asfaltowa on the episode from the ul.Pawiej to the end of the cannon No. 1/94 AM-8 obrąb Wojszyce along with the draft documentation