Tender Results of Bangladesh Water Development Board

Tender Results of Bangladesh Water Development Board

Bangladesh Water Development Board - BWDB Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date6 Jan 2025
Contract AmountBDT 1.1 Million (USD 9.1 K)
Repair & Maintanance work of T5/S-5G irrigation canal from km.0.000 to km 2.500 under operation budget at kushtia WD Division, BWDB, Kushtia during the FY-2024-25.

Bangladesh Water Development Board - BWDB Tender Result

Works
Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date6 Jan 2025
Contract AmountBDT 1.2 Million (USD 10.6 K)
Repair, Maintenance & Miscellaneous Works Of Gate-hoisting System; Greasing, Servicing & Painting Works Of Navigation Lock Gate’s; Cleaning Navigation Lock Yard At Bera Pumping Station; Greasing, Servicing And Painting Works Of Gate Hoisting System; Manufacturing, Supplying & Installation Of M.s Vertical Lift Gate And Repair Works Of Gate Control System Of Different Irrigation Structure Under Pabna Mechanical Pump House Division During The Fy 2024-25.

Bangladesh Water Development Board - BWDB Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date6 Jan 2025
Contract AmountBDT 2 Million (USD 17 K)
Repair of Ring Dyke from km. 0.000 to km. 0.580 = 580.00 m at Kholishakura in Upazila: Sadar, District: Sirajganj Uuder Sirajganj Water Development Division, BWDB, Sirajganj during the year 2024-2025.

Bangladesh Water Development Board - BWDB Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date6 Jan 2025
Contract AmountBDT 2.3 Million (USD 19.2 K)
Breach closing and re-sectioning of low height embankment from ch. 310.00 m to ch. 560.00 m =250.00 meter near milk vita, ch. 4080.00 m to ch. 4120.00 m =40.00 meter at Bohalbari and in between ch. 0.00 m to ch. 27.00 m =15.00 meter Total 305 meter near dilruba bus stand in connection with SIRDP Project in Shahjadpur upazila, District-Sirajganj under Sirajganj WD Division, BWDB, Sirajganj during the year 2024-2025.

Bangladesh Water Development Board - BWDB Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date5 Jan 2025
Contract AmountBDT 189.8 K (USD 1.5 K)
Survey work for preparetion of design data collection, TBM fly etc. for different place of Chatmohor WD Section under Pabna WD Division, BWDB, Pabna during the year 2024-25.

Bangladesh Water Development Board - BWDB Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date5 Jan 2025
Contract AmountBDT 189.9 K (USD 1.5 K)
Breach closing of Baghabari to Nimaichora Flood Control Embankment (near Ratanpur)from Km. 7.975 to Km. 8.000 Total 25.00 m under Pabna WD Division, BWDB,Pabna during the FY: 2024-25.

Bangladesh Water Development Board - BWDB Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date5 Jan 2025
Contract AmountBDT 454.4 K (USD 3.7 K)
Breach closing and construction of low height cross bundh at Bill Surja river from ch. 0.00 m to ch. 40.00m = 40.00 meter in connection with SIRDP Project in Ullapara-Upazila, District-Sirajganj under Sirajganj WD Division, BWDB, Sirajganj during the year 2024-2025.

Bangladesh Water Development Board - BWDB Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date5 Jan 2025
Contract AmountBDT 469 K (USD 3.8 K)
Repair and Maintenance of DFC-7G (from Km. 0.000 to Km. 0.500), DFC-7AG (from Km 0.000 to Km. 1.200) and DFC-9AG (from Km. 0.000 to Km. 1.000) Irrigation Canal under the Operational Budget of Chuadanga WD Division, BWDB, Chuadanga during the Financial Year 2024-25.

Bangladesh Water Development Board - BWDB Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date5 Jan 2025
Contract AmountBDT 469.5 K (USD 3.8 K)
Repair and Maintenance of DFC-6G (from Km. 0.000 to Km. 1.000), DFC-6AG (from Km 0.000 to Km. 1.000) and DFC-6AAG (from Km. 0.000 to Km. 0.500) Irrigation Canal under the Operational Budget of Chuadanga WD Division, BWDB, Chuadanga during the Financial Year 2024-25.

Bangladesh Water Development Board - BWDB Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date5 Jan 2025
Contract AmountBDT 469.5 K (USD 3.8 K)
Repair & Maintenance works of dyke at the Right bank of S5K irrigation canal in between from km. 11.350 to km. 13.100 total 0.080 km under Operation Budget at Kushtia WD Division, BWDB, Kushtia during the FY 2024-25.
31-40 of 763 active Tender Results