Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

DRM ENGINEERING acting for and on behalf of The President of India invites E-Tenders against Tender No O-AC-T-137-19-20 Closing Date/Time 09/09/2019 12:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed. 1. NIT HEADER Name of Work Open tender for painting of Rails and ERC greasing including cleaning of overburden earth beside the track in the section of SSE (P-Way)/MNAE. Bidding type Normal Tender Tender Type Open Bidding System Single Packet System Tender Closing Date Time 09/09/2019 12:00 Date Time Of Uploading Tender 06/08/2019 15:24 Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Advertised Value 9291381.55 Tendering Section P.WAY Bidding Style Single Rate for Each Schedule Bidding Unit Earnest Money (Rs.) 185900.00 Validity of Offer ( Days) 45 Tender Doc. Cost (Rs.) 5000.00 Period of Completion 12 Months Contract Type Works Contract Category Expenditure Bidding Start Date 26/08/2019 Are Joint Venture (JV) firms allowed to bid No Ranking Order For Bids Lowest to Highest Expenditure Type Revenue 2. SCHEDULE S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule A-Overall percentage above/below At par on assessed cost of schedule-A ( N.S. Items) 8116000.00 Above/ Below/Par 1 Please see Item Breakup for details. 8116000.00 AT Par 8116000.00 Item Description:- Item breakup of Schedule-A S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-Overall percentage above/below At par on assessed cost of schedule-B (items of USSOR-2011) 1175381.55 Above/ Below/Par 2 Please see Item Breakup for details. 977367.00 20.26 1175381.55 Item Description:- Item breakup of Schedule-B (Items of USSOR-2011 3. ITEM BREAKUP Schedule Schedule A-Overall percentage above/below At par on assessed cost of schedule-A ( N.S. Items) Item- 1 Item breakup of Schedule-A S No. Item No Description of Item Unit Qty Rate Amount 1 1 Greasing ERC. This includes opening of ERC, cleaning of CI insert of metal liners on rail foot, liners by means of wire brush, greasing ERC leg, inside CI insert and contact surface of rail foot by liners, renewal of corroded/teamed/crushed liners, rubber pad and ineffective ERCs and fixing them properly as per IRPWM in all respect. Grease to be supplied by contractor. Each 300000.00 10.85 3255000.00 2 2 De-stressing of LWR track as per IRPWM manual with/without of rail tensor as directed by Engineer-in-Charge or his authorized representative at site including removal of all fittings for free movement of rails, opening of level crossing etc, fitting LWR in panels of any length as directed by Engineer-in-Charge or his authorized representive. Greasing of all pandrol clips after duly cleaning the clips and insert by contractor's wire brush, changing of the rubber pads/fittings wherever required, putting the rail on roller at every fifteenth sleepers, adjustment of gap at SEJ, lubrication of SEJ, fixing of fittings correctly from center of panel towards both ends, cutting of extra rails after de-stressing, insertion of cut rails of required sizes. Per Track Metre 25000.00 40.96 1024000.00 Page 1 of 8 Run Date/Time: 06/08/2019 15:25:27 ASANSOL DIVISION-ENGINEERING/EASTERN RLY TENDER DOCUMENT Tender No: O-AC-T-137-19-20 Closing Date/Time: 09/09/2019 12:00 3 3 Painting of rails as per following schedule after cleaning the surface. (i) One coat of red oxide primer. (ii) Two coats of bitumen paint conforming to IS:9862 The surface to be painted should be thoroughly scrapped with wire brush and cleane

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.