Gorakhpur Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Gorakhpur Development Authority - GDA Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date17 Oct 2023
Closing Date6 Nov 2023
Tender Amount₹ 29,46,674
Costs
EMD
₹ 2,94,700Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_GORDA_850959_5Bid Award Id
ViewTender No
26/GDA/2023-24/09102023Tender Authority
Gorakhpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber,finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/expansion, construction & longitudinal joints(10 mm widex50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealan complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately.Cement concrete prepared with batch mixing machine (DSR 16.43.1)
74
621655
8400.75
... More
Providing and laying of factory made 80mm thick rubber moulded Interlocking Cement Concrete tiles (30Mpa) including 25mm thick compacted bed of fine sand compacting and proper embedding / laying of interlocking tiles levelling & dressing of surface to required level & slope filling joints with fine sand including the cost of materials , labour,T&P required for proper completion fo work as directed by engineer- in-charge.(NEW ITEM)
300
243000
810
... More
Providing and laying 125 mm polythene sheet above road surface as per direction of e/i (PWD-SOR/2014)
488
12200
25
... More
Excavation in foundation in ordinary soil(loam clay or sand) including lift upto 1.5 m & lead upto 30 m ,including filling ,watering & rammimg of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches (excluding Royality ) SOR CHAPTER-4 (SI-251)/2020
57
6840
120
... More
Cement concretewith 4 cm gauge approved stone ,ballast,approved coarse sand and cement in the proportion of 1:4:8 including supply of all materials , labours and T&p etc. required for proper completion of the work SOR CHAPTER-5( SI 281)/2020
17
92395
5435
... More
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate /retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately.In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.Concrete of M25 grade with minimum cement content of 330 kg /cum (DSR 5.33.1.1/2021)
58
410480
7077.25
... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.(DSR-5.9.1/2021)
315
85837
272.5
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage , bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.(App. Rate)
98
777140
7930
... More
P/f in position rubberised hot sealing compound for expansion joints DSR-16.46.1
120
792
6.6
... More
R.C.C work with cement approved coarse sand and 2 cm (3/4)" gauge approved stone grit in the proportion of 1:1.5:3 for slabs excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials , labour and T& P etc. required for proper completion of the work ,Binding wire cost being included in the item.SOR CHAPTER-5( SI-284 A)
9
79200
8800
... More
M-150 class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. SORSI-305
3
13665
4555
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements