The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date23 Jan 2025
Closing Date7 Feb 2025
Tender Amount₹ 12,38,454 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Roofing/Side sheeting with A.C corrugated sheets 6mm thick including cost and conveyance of AC Sheets, 8mm dia G.I J bolts, GI washers, bitumen washers and labour charges including fixing of wind ties as per the requirement etc., complete (with /without Ridges / Valley gutters) for finished item of work (cost of wind ties and its fabrication charges are not included)

300

404

121470

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete

1

9089

9089.2

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

1

14770

14770

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;White washing to Old walls with Surya Cem / Equivalent Cem, two coats complete for finished item of work.

800

26

20960

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.

1

5838

5838.08

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

50

141

7053.5

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Providing gultha in CM 1:6, 20 mm thick and 150 mm wide including necessary scraping of wall and finishing the surface as directed ( But Excluding Cost of Cement )

150

31

4749

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

6

13984

83906.4

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm & 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, etc, (but excluding cost of steel reinforcement and its fabrication charges, centering and shuttering charges and Cost of Cement) for dwarf Walls for Railings, parapets, corridor walls etc.,. (CA : 0.90 Cum, FA:0.45Cum)

23

14118

324735.39

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Raft.

60

7514

450895.8

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Demolishing Plain Cement Concrete through Manual means and disposal of unserviceable materials within 100 metres lead - upto 15 cm thickness.

100

1630

163010

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Conveyance charges of Steel including loading, unloading and stacking charges for 3 KM lead.

6

297

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Dismantling G.I sheets, AC Sheets in Sides and Roof including ridging etc.,

300

71

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Conveyance charges of CEMENT including loading, unloading and stacking charges for 3 KM lead.

33.69

255

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Roofing/Side sheeting with A.C corrugated sheets 6mm thick including cost and conveyance of AC Sheets, 8mm dia G.I J bolts, GI washers, bitumen washers and labour charges including fixing of wind ties as per the requirement etc., complete (with /without Ridges / Valley gutters) for finished item of work (cost of wind ties and its fabrication charges are not included)

300

404

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete

1

9089

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

1

14770

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;White washing to Old walls with Surya Cem / Equivalent Cem, two coats complete for finished item of work.

800

26

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.

1

5838

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

50

141

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Providing gultha in CM 1:6, 20 mm thick and 150 mm wide including necessary scraping of wall and finishing the surface as directed ( But Excluding Cost of Cement )

150

31

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

6

13984

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm & 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, etc, (but excluding cost of steel reinforcement and its fabrication charges, centering and shuttering charges and Cost of Cement) for dwarf Walls for Railings, parapets, corridor walls etc.,. (CA : 0.90 Cum, FA:0.45Cum)

23

14118

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Raft.

60

7514

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Demolishing Plain Cement Concrete through Manual means and disposal of unserviceable materials within 100 metres lead - upto 15 cm thickness.

100

1630

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Conveyance charges of Steel including loading, unloading and stacking charges for 3 KM lead.

6

297

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Dismantling G.I sheets, AC Sheets in Sides and Roof including ridging etc.,

300

71

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Conveyance charges of CEMENT including loading, unloading and stacking charges for 3 KM lead.

33.69

255

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Roofing/Side sheeting with A.C corrugated sheets 6mm thick including cost and conveyance of AC Sheets, 8mm dia G.I J bolts, GI washers, bitumen washers and labour charges including fixing of wind ties as per the requirement etc., complete (with /without Ridges / Valley gutters) for finished item of work (cost of wind ties and its fabrication charges are not included)

300

404

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete

1

9089

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

1

14770

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;White washing to Old walls with Surya Cem / Equivalent Cem, two coats complete for finished item of work.

800

26

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.

1

5838

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

50

141

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Providing gultha in CM 1:6, 20 mm thick and 150 mm wide including necessary scraping of wall and finishing the surface as directed ( But Excluding Cost of Cement )

150

31

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

6

13984

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm & 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, etc, (but excluding cost of steel reinforcement and its fabrication charges, centering and shuttering charges and Cost of Cement) for dwarf Walls for Railings, parapets, corridor walls etc.,. (CA : 0.90 Cum, FA:0.45Cum)

23

14118

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Raft.

60

7514

-

... More
Repairs to the existing clean water chamber walls and floor for arresting leakages of storage tanks;Demolishing Plain Cement Concrete through Manual means and disposal of unserviceable materials within 100 metres lead - upto 15 cm thickness.

100

1630

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.