For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Civil And Construction
Pipe Line Project
Opening Date31 Mar 2022
Closing Date8 Apr 2022
Tender Amount₹ 3,85,932 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
pipe;RR masonry in CM(1:3) prop. using hard granite stone from approved quarry including cost and conveyance of all materials to site, all labour charges for dressing stones to required size and shape, mixing of cement mortor, stone wall construction, curing, etc. complete for finished item of work, excluding GST & Seignoriage Charges, as per MORTH Specification 1400 & 2200 (5th revision)

23

-

128278.36

... More
pipe;Supply and Delivery,fixing of 300 mm dia NP3 R.C.C. Socket and Spigot pipes conforming to B.I.S. 458/2003 at exfactory (rate per meter of effective length) including cost and conveyance of pipes to site, labour chares for lowering, laying pipes & jointing including cost of jointing materials, curing charges, all taxes, except GST, Hire and Operatinal charges of T & P required etc., complete for finished item of work as directed by the Engineer-in-Charge.

110

-

190747.7

... More
pipe;Providing, laying, spreading and compacting Robo Sand specification including cost and conveyance of all material, hire and operational charges of T&P, labour charges for all operations,carriage of material by tipper to site, laying in uniform layers on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of traffic, etc., complete for finished item (for junctions as directed by the Engineer - in - Chief) Excluding GST & Seignoriage Charges

12

-

14424.12

... More
pipe;Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate conforming to table 1000-2 of MORT&H specification including cost, conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge , excluding GST & Seignoriage Charges, for foundations.

2

-

9733.78

... More
pipe;Conveyance of excavated soils with machinery per 5km for transportation of materials by tipper and truck including loading un loading the following lead and dumpiing on the road alignment wherever required as directed by Engineer -in- charge. Excluding GST and Seigniorage Charges

126

-

13582.8

... More
pipe;Excavation for roadwork of roads in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m, all taxes except GST as per MORTH - 301.(pipe portion)

121

-

15422.66

... More
pipe;Cutting open BT road surface including breaker charges, labour charges, operational and incidental charges, all taxes etc., except GST, complet for finished item of work

5

-

6402.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.