Municipal Administration Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Civil Works Others
Opening Date20 Jun 2023
Closing Date23 Jun 2023
Tender Amount₹ 12,20,219
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
430717Bid Award Id
ViewTender No
E/MCM/2023-24/09Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work.
554.22
488
270570.2
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Plain Cement concrete nominal mix M15 (1:2.5:5) using coarse and fine aggregates including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges, for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
7.9
5330
42111.03
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.
181.4
88
16052.09
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Columns Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site ,Steel scaffolding pipes, jack props, wallers Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work.
0.72
12896
9285.67
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Pedestals Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site andusing Steel scaffolding pipes, jack props, wallers Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work.
0.49
10470
5130.46
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Footing Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site andusing Steel scaffolding pipes, jack props, wallers Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)
1
9910
9910.2
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of , including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
49.06
7756
380528.49
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
27.34
4748
129822.35
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
36.45
4306
156977.76
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Plain Cement Concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , ,on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
8.96
4494
40268.75
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Filling with Murrum in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
70
537
37656.5
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Earthwork excavation in ordinary soils up to 3.00m depth by manual means excluding dewatering as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH.
65.34
258
16861.64
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Hiring of Dozer for clearing heavy jungle and levelling Play Ground
5
900
4500
... More
Balance work of Compound wall and other repairs in Kasturba Vidhyalayalm;Hiring of excavator for clearing heavy jungle and levelling Play Ground
10
1500
15000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements