State Industries Promotion Corporation Of Tamil Nadu Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
State Industries Promotion Corporation Of Tamil Nadu Limited - SIPCOT Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Aug 2024
Closing Date19 Aug 2024
Tender Amount₹ 9,89,24,000
Costs
EMD
₹ 5,05,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SIPCT_469166_1Bid Award Id
ViewTender No
NIT.No.16/CD/T.No.16/2024-25Tender Authority
State Industries Promotion Corporation Of Tamil Nadu Limited ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work excavating and depositing on bank in SDR - ( not requiring blasting ) in Soft disintegrated rock, laterite, soft rock or kankar not requiring blasting and deposting the same to the road side etc complete complying with standard specification and as directed by SIPCOT Officers.
18124
-
-
... More
Supply and laying NP2 class - 300m dia pipes including collar etc complete complying with standard specification and as directed by SIPCOT Officers.
170
-
-
... More
Forming embankment using excavated earth (1 Km internal lead) which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 250 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 95% proctor density for the soil below the top of 0.5 meter height of subgrade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by Engineer in charge and finishing the embankment at 95% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification . (Forming Embankment using excavated earth at 95% Compaction)
1945
-
-
... More
Forming Subgrade using Excavated earth with a Internal lead of 1 Km which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification. (Forming Subgrade at 97% Compaction) etc complete complying with standard specification and as directed by SIPCOT Officers.
949
-
-
... More
Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers.
1737
-
-
... More
Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- III of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers.
1389
-
-
... More
Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 150mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 and as directed by SIPCOT Officers.
3305
-
-
... More
Providing and laying Prime coat over wet mix macadam surface using 7.00 Kg bitumen for 10 sqm area including cost and conveyance of bitumen emulsion binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 502 of MORT & H specifications. etc complete complying with standard specification and as directed by SIPCOT Officers.
13219
-
-
... More
Providing and laying Tack coat over treated wet mix macadam surface using 2.50 Kg bitumen emulsion to cut back for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 503 of MORT & H specifications. and as directed by SIPCOT Officers.
13219
-
-
... More
Providing and laying to 95 mm thickness Dense Bituminous macadam using 0.40 cum of 37.50 -13.20 mm IRC size graded metal 0.35 cum of 13.20 - 2.36mm IRC graded metal and 0.36 cum of 2.36mm and below IRC size HBG metal with 71.30 kg of VG40 bitumen for premixing for 10 Sq.meter includin cost and conveyance of all materials to CMP site including cost and conveyance of bitumen and other materilas to CMP site heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hoti mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 95 mm with mechanical paver to the specified grades and cross sections and compaction by vibratory Pneumatic Roller to the required density etc., including labour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire,fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper ttrucks, paver finisher/9 m paver finisher, vibratary/Pneumatic Roller, and al other tools & plants required including fuel and all other incidental charges etc., complete asper specification using CMP as per clause 505 MORTH REV. V Specification and as per directed SIPCOT Officers.(Grade I)
1256
-
-
... More
Providing and laying 40mm compacted thickness bituminous concrete using 0.13 cum of 19.0 - 9.5 mm graded IRC size HBG metal 0.17 cum of 9.5-2.36mm IRC graded metal and 0.26 Cum. of 2.36 mm and below size graded metal with 50.30 of bitumen grade VG 40 confirming to IS 73 for pre mixing for 10 Sq. meter and using materials as per table 500 - 17 and staifying the physical requirement for material for course aggregates for BC as per table 500 - 16 of MORTH REV-V including cost and conveyance of all materials to CMP site , heating the bitumen andaggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveyin the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidation 80-100 kn vibratory/Pneumatic road roller to the required density etc., includinglabour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire, fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper trucks, paver finaisher/9 m paver finisher /Vibratory/Pneumatice road roller , and all other tools and plants requried, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 OF MORTH REV. specification and as directed by SIPCOT Officers. (Grade II) etc complete complying with standard specification and as directed by SIPCOT Officers.
529
-
-
... More
Vibrated cement concrete of grade M15 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc complete complying with standard specification and as directed by SIPCOT Officers. Below Median
459
-
-
... More
Providing RCC Centre Median of size 0.610m at bottom 0.250m at middle 0.150 at top and to height of 0.90m from the road level including cost and conveyance of all materials to work site including picking the existing B.T surface if necessary and excavating the necessary depth to have a median, and providing form work for shuttering on both sides and chamfered edges at top, including cost of steel reinforcement as per the Bar bending schedule appended here with, fabrication and placing in position of steel grills including cost of binding wire, laying of R.C.C M25 concrete using ISS HBG graded metal including cost and conveyance of all materials to work site from the approved sources including labour charges for mixing laying curing etc middle of the median as directed by the SIPCOT Officers, Rendering Smoothness over the CC surface with 10 kg of cement for 10 sqm area and painting two coats over the CC surfaces with best approved quality of synthetic enamel paint including primer etc., including all labour charges, hire and fuel charges for the tools and plants employed and as per the standard specification etc complete and as directed by SIPCOT Officers.
753
-
-
... More
PART - B CONSTRUCTION OF SINGLE CELL BOX CULVERT ( 1 x 2.00 x 2.00)
-
-
-
... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevant standard specification for dressing the bed up to sill level .
178
-
-
... More
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation
49
-
-
... More
Vibrated Cement concrete in CC M15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for foundation.
13
-
-
... More
Vibrated Reinforced Cement concrete in M 25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CELL BOX
63
-
-
... More
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete.
4.4
-
-
... More
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete
2
-
-
... More
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, complete as per relevant standard specification, wearing coat of 75mm uniform thickness over deck slab and approach slab
38
-
-
... More
Vibrated cement concrete of grade M20 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc, complete as per relevent standard specifications for Wings walls, & parapet wall.
42
-
-
... More
PART C - CONSTRUCTIONN OF TRIPLE CELL BOX CULVERT ( 3 x 2.00 x 2.00)
-
-
-
... More
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation
43
-
-
... More
Vibrated Cement concrete in M 15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for foundation.
24
-
-
... More
Vibrated Reinforced Cement concrete in M 25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc complete complying with standard specification and as directed by SIPCOT Officers. CELL BOX
152
-
-
... More
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete complying with standard specification and as directed by SIPCOT Officers.
12.6
-
-
... More
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top including cost and conveyance of GI pipes and flats and fixing them in position etc complete complying with standard specification and as directed by SIPCOT Officers.
6
-
-
... More
Vibrated Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm IRC Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, etc complete complying with standard specification and as directed by SIPCOT Officers. wearing coat of 75mm uniform thickness over deck slab and approach slab
108
-
-
... More
Vibrated cement concrete of grade M20 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc complete complying with standard specification and as directed by SIPCOT Officers. for Wings walls, & parapet wall..
44
-
-
... More
PART D - WIDENING THE OF EXISTING SINGLE CELL BOX CULVERT ( 1 x 2.00 x 2.00)
-
-
-
... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc complete complying with standard specification and as directed by SIPCOT Officers. for dressing the bed up to sill level .
99
-
-
... More
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc complete complying with standard specification and as directed by SIPCOT Officers. for foundation
32
-
-
... More
Vibrated Cement concrete in CC M15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc complete complying with standard specification and as directed by SIPCOT Officers. for foundation.
8
-
-
... More
Vibrated Reinforced Cement concrete in M 25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc complete complying with standard specification and as directed by SIPCOT Officers. for CELL BOX
42
-
-
... More
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete complying with standard specification and as directed by SIPCOT Officers.
3
-
-
... More
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc complete complying with standard specification and as directed by SIPCOT Officers.
1
-
-
... More
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, etc complete complying with standard specification and as directed by SIPCOT Officers. wearing coat of 75mm uniform thickness over deck slab and approach slab
24
-
-
... More
Vibrated cement concrete of grade M20 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc complete complying with standard specification and as directed by SIPCOT Officers. for Wings walls, & parapet wall.
21
-
-
... More
PART E - CONSTRUCTION OF RCC STROM WATER DRAIN
-
-
-
... More
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc complete complying with standard specification and as directed by SIPCOT Officers. for foundation of Drain
2837
-
-
... More
Earth work excavating and depositing on bank in SDR - ( not requiring blasting ) in Soft disintegrated rock, laterite, soft rock or kankar not requiring blasting , including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc complete complying with standard specification and as directed by SIPCOT Officers. for foundation of Drain
4003
-
-
... More
Vibrated Cement concrete in CC M15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc complete complying with standard specification and as directed by SIPCOT Officers. for Drain foundation.
266
-
-
... More
Vibrated Reinforced Cement concrete in M25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc complete complying with standard specification and as directed by SIPCOT Officers. for RCC Drain Base Slab, Walls.
1048
-
-
... More
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete complying with standard specification and as directed by SIPCOT Officers.
64.62
-
-
... More
Supply and fixing of FRC manhole cover of size 0.75 x 0.75 m including cost of all materials and all labour Charges etc complete complying with standard specification and as directed by SIPCOT Officers.
156
-
-
... More
Supplying and fixing of M.S grating of 300 x 200mm size with M.Sfjats of 25x10mm for outer frames, 25x6mm for inner bracer and PVC pipe 150mm dia fixed with mild steel grating and fixing them in position etc complete complying with standard specification and as directed by SIPCOT Officers.
156
-
-
... More
Painting two coats over the CC surfaces using Synthetic Enamel Paint over the the new Cement concrete surfaces including cost of paint, primer and labour charges etc, including all inidental charges etc complete complying with standard specification and as directed by SIPCOT Officers.
308
-
-
... More
Sub Total of Total Amount in Column BA (ie. Qty x Unit Rate)
1
-
-
... More
Added GST of 18%
1
-
-