Directorate General Of Lighthouses And Lightships Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Directorate General Of Lighthouses And Lightships - DGLL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date9 Jul 2024
Closing Date5 Aug 2024
Tender Amount₹ 1,07,38,635 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) including supply of all labour, materials, tools etc complete.

90

-

7311.25

... More
Filling available excavated earth/ morrum obtained from borrow pits (excluding rock) in trenches, plinth, sides of foundations, floors etc. in layers not exceeding 20 cm. in depth consolidated each deposited layers by ramming and watering lead up to 50m and lift upto 1.5m including supply of all labours, tools etc. complete as directed by enginer in charge.

297.3

-

196

... More
Providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) upto floor two level including laying, compacting, curing complete with all materials, tools, labours etc. as directed by the engineer in charge but excluding the cost of formwork and reinforcement.

9.78

-

495.75

... More
Construction of coursed rubble masonry with hard stone (first sort) in superstructure above plinth level and upto floor five level in Cement mortar 1:6 (1 cement : 6 coarse sand) including supply of all labour, materials, tools etc complete.

248

-

10741.6

... More
Providing and laying cement concrete in coping with 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including the cost of centering, shuttering and finishing as required or as directed including supply of all materials, tools, labours etc. complete as directed by the engineer in charge.

34

-

9895.2

... More
18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement: 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge including supply of all labours, tools, materials, etc. complete as directed by the engineer in charge.

2727.54

-

537.45

... More
Finishing walls with 1st quality Premium Acrylic Smooth exterior paint with Silicone additives of required shade (Asian/ Snowcem/ Berger) on new work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) at all heights to give an even shade etc. wherever required including supply of all materials, labours, tools, scaffoldings etc. complete as directed by the engineer in charge.( total rate is Rs.36.95+ 96.80 = 133.75)

2727.54

-

245.05

... More
Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).

76.15

-

8821.65

... More
Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.

1231.75

-

972

... More
Painting two or more coats on Exposed surfaces of Kerb Stone, Flag mast and CC chairs with synthetic enamel paint of approved brand and manufacture (Asian/Berger/or equivalent) of required colour to give an even shade over a coat of approved water thinnable cement primer including cost of all materials, labour, tools & plants etc. complete as directed by Engineer in charge.

958.5

-

226.25

... More
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content including supply of all materials, tools, labours etc. complete as directed by the engineer in charge. (With ready mixed red oxide zinc chromatic on steel / iron works having VOC content less than 250 grams/ litre)

958.5

-

73.95

... More
Providing, supplying & storing of potable water for working and drinking purpose by water tanker at the Lighthouse, including cost of water, transportation, storing and as directed by engineer in charge

1

-

284341.67

... More
Additional transporation cost of material due to remote location of site which is around 65 Km away from Ratnagiri or almost the same distance from Rajapur City. The material transport is also tough due to incomplete road near Lighthouse station and strict security of Jaitapur Nuclear Power plant. The securty of the Power plant requires all the trucks to carry all the documents and PUC certificate. Hence local material suppliers are not supplying material to this site. Only registered and reputed suppliers supply material and their rates are high due to transportation cost.

1

-

976239.51



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.