Public Works Department Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Public Works Department - PWD Tender
Civil Works Others
Opening Date27 Aug 2021
Closing Date4 Sep 2021
Tender Amount₹ 2,61,05,652 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 3,76,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
KPWD/2021-22/RD/WORK_INDENT138928/CALL-2Bid Award Id
ViewTender No
KPWD/2021-22/RD/WORK_INDENT138928/CALL-2Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://kpwd.karnataka.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to is 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
319.5413
-
2136702.37
... More
KSRB 2.3 : Filling available excavated earth ( excluding rock ) in sides of foundations upto plinth in layers not exceeding 20 cms. in depth, compacting each deposited layer by ramming after watering with lead upto 50 m. and lift upto 1.5 m. including cost of all labour complete as per specifications. specification. No. KBS 2.9 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
763.8561
-
161211.83
... More
KSRB 2.5 : Earthwork excavation in all soil deposits and filling sides of foundation upto plinth in layers not exceeding 20cms. in depth, compacting each deposited layer by ramming after watering with all lead and lift including cost of all labour complete as per specifications. specification. No. KBS 2.9.9 / 2.9.10.1 / 2.1.1 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
601.5165
-
254531.71
... More
KSRB 4.9.2 : Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3 - TMT bars Fe 500 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
94.8268
-
7832712.65
... More
KSRB 4-6.1 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specificaitons. Specification No. KBS 4.6.2 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
466.56
-
126391.1
... More
KSRB 4-6.5 : Providing and removing centering, shuttering, strutting, propping etc., for columns, pillars, post and struts, square / rectangular/ polygon in plan including cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
1126.08
-
539167.1
... More
KSRB 4-6.7 :Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1m in depth including cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
2903.067
-
887032.12
... More
KSRB 4-6.11 :Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Stairs (excluding landing) except spiral staircase including cost of all materials, labour complete as per specificaiton. Specification No. KBS 4.6.2 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
2470.82
-
1354256.44
... More
KSRB 15-16.1 : Providing and finishing external walls in two coats with waterproof cement paint of approved brand and shade to give an even shade after throughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, complete as per specifications. - with primer ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
5029.2705
-
522792.67
... More
Fabricating, supplying and erecting M.S. TubularTruss of span upto 10m. The bottom and top member is provided with 50x50x6mm double equal angles, welded back to back and in between top and bottom line, in areas of mid section is provided with 50x50x6mm equal single angle for vertical and inclined members and at supporting ends 40x40x5mm single angle is provided. All the members are welded together with 6mm gusset plate as per Drawing. The entire truss is anchored in RCC column by using 4 Nos. of M.S. anchor bolts at each support, with 10mm thick base plate and shoe plate.The work includes cutting, straightening, placing in position of M.S angle and wleding wherever necessary, and applying one coat of red oxide primer coat to all themembers including cost of all materials, labour charges, and hire charges of machineries for cutting, welding, grinding and erection equipments, with all lead and lift, transportation, etc., complete as per specification. ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
29677.5
-
3427751.25
... More
KSRB 15-18.2 : Providing and applying enamel metal paint two coats ( excluding priming coat ) over new steel or other metal surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, including cost of materials, labour, complete as per specifications. ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
316.56
-
30579.7
... More
PROVIDING TRAPEZOIDAL PROFILED SHEET Providing and installing of pre painted Galvolume iron Trapezoidal profiled sheet of approved make 1060 mm width (1000 mm cover width), 28-30 mm crest height with crest distance of 200 mm c/c with 2 ribs at the centre for stiffening. The total coated thickness (TCT) of the sheet will be 0.47 mm +/- 0.02 mm tolerance Zinc-Alu Alloy coating AZ150 gsm as per ASTM 1397/A755-550 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 20-22 microns using self drilling/self tapping screws of 25 mm length, to be fixed over the existing purlins, rafters, channels and trusses. ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
2532.48
-
2047510.08
... More
Providing and installing of approved make pre painted Galvalume iron Accessories, like, plain, ridges, plain gutter, plain flashing, corner Trim, etc. The total coated thickness (TCT) of the sheet shall be 0.47 mm +/- 0.02 tolerance mm Zinc-Alu Alloy coating AZ 150 gsm as per ASTM 1397/755 -550 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 20-22 microns using self drilling / self tapping screws of 25 mm length. (width upto 500-600 mm only), to be fixed over the existing purlins, rafters, channels and trusses. ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
94.968
-
73790.14
... More
Providing and fixing Stainless steel staircase raling as per Chief Architect Drawing No. 11520/ HRSC with hand rail 50mm dia 16 guage hollow pipe welded to vertical hollow 50mm dia pipe of 16 guage, stainless steel vertical pipe spaced at 1.20m regular intervals, and 5 Nos of 25mm dia. Stainless steel hollow horizontal pipe are welded to vertical 50mm dia hollow pipe. The entire assembly is fixed to staircase concrete by using expansion bolts by drilling concrete etc., complete including cost of materials, labour, HOM of machineries and electrical charges, etc., complete as per specifications. ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
107.64
-
677792.93
... More
KSRB 4.2.8: Providing and laying in position reinforced cement concrete of design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.46cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in ground floor level for roof slabs, staircase, lintles, and beams retaining walls, return walls, walls (any thickness) including attached plasters, columns, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications. Specification No. KBS 4.1, 4.6 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
549.0711
-
3805847.89
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements