UCC: ENGINEERING SERVICES FOR CIVIL/INFRA/BUILDING PROJECTS-Carry out some of the future civil/infrastructure facilities related to FEED and ECS contracts through an Umbrella Consultancy Contract (UCC) by establishing a pool of Contractors that will be available on call at short notice as per QP's operational requirement.
Contract Date27 Oct 2019
Contract AmountQAR 20 Million (USD 5.4 Million)
Qatarenergy Tender Result
Result Stage: Awarded (AOC Available)
Qatar
MAINTENANCE SUPPORT SERVICES FOR VALVES AT OFFSHORE LOCATION-ontractor shall provide qualified and experienced Technicians to carry out periodic maintenance and repair works of safety relief valves , level and flow control valves,emergency and shut down valves at QP offshore locations on a call off basis. Contract Duration : Four(4) years Trades of Manpower : 1.Valve Specialist Engineer 2.Foreman 3.Valve Technician Scheduled Start Date: 01/09/2019 Scheduled Completion Date: 31/08/2024
Contract Date1 Oct 2019
Contract AmountQAR 3.8 Million (USD 1 Million)
Qatarenergy Tender Result
Result Stage: Awarded (AOC Available)
Qatar
PROVISION OF CORING EQUIPMENT AND SERVICES FOR QP ONSHORE AND OFFSHORE OPERATIONS ON CALL OFF BASIS FOR A PERIOD OF 5 YEARS PLUS 2 MONTHS FOR INITIAL MOBILIZATION AND INSPECTION-CORING EQUIPMENT & SERVICES FOR Offshore & Onshore Wells
Contract Date16 Sep 2019
Contract AmountQAR 5.7 Million (USD 1.5 Million)
Qatarenergy Tender Result
Result Stage: Awarded (AOC Available)
Qatar
BATCH INHIBITION OF GAS LINES ON CALL-OFF BASIS-The Scope of Services include provision of Batch inhibition services, on call-off basis, for approximately sixty seven (67) pipe lines including stripped associated/raw associated gas lines, Gas lift and Khuff gas pipelines. Contract duration shall be five (5) years.
Contract Date8 Sep 2019
Contract AmountQAR 10.1 Million (USD 2.7 Million)
Qatarenergy Tender Result
Result Stage: Awarded (AOC Available)
Qatar
HAZOP AND OTHER SAFETY STUDIES FOR EXISTING PRODUCTION FACILITIES, STATIONS AND OPERATING UNITS AT QP OPERATIONAL AREAS-Contractor shall carry out the following safety studies for QP the operating units: (1) Dukhan - HAZOP and SIL; (2) Offshore - HAZOP; (3) Refinery - HAZOP, SIL, ESDV Adequacy Study, Fire and Gas Mapping Study, PSV Adequacy Study, Fixed Fire Protection Study, QRA Update; (4) Mesaieed - HAZOP & SIL.
Contract Date1 Sep 2019
Contract AmountQAR 1.5 Million (USD 430.4 K)
Qatarenergy Tender Result
Result Stage: Awarded (AOC Available)
Qatar
PROVISSON OF STIMULATION VESSEL & SERVICES FOR OFFSHORE WELLS OF QP ON CALL-OFF BASIS-Provision Of Stimulation Vessel For Offshore Operations 1.,,Contractor shall provide all Contractor Personnel, services, Vessel, Contractor Items and each and every item of expense necessary for the provision of Stimulation Vessel and performance of offshore stimulation jobs as and when required by QP on call-off basis. 2.,,The Services shall include, but are not limited to, the following: i.,,Acidization ii.,,Nitrogen Lift iii.,,De-scaling iv.,,Scale / corrosion inhibitor squeeze v.,,Fracturing vi.,,Kill and well control operations 3.,,The Vessel shall be class-certified, dynamically positioned (DP Class -2). 4.,,Vessels shall not be not more than 15 years old at the start of Contract. 5.,,The estimated number of wells, which may require Stimulation Services, are approximately sixty eight (68) 6.,,Contract Duration for the Services shall be sixty three (63) months, including three (3) months for initial mobilization and inspection, from the Effective Date of Contract.
Contract Date1 Sep 2019
Contract AmountQAR 119.6 Million (USD 32.8 Million)
Qatarenergy Tender Result
Result Stage: Awarded (AOC Available)
Qatar
EPIC FOR NEW COOLING WATER SYSTEM FOR NGL 1, 3 & 4-The Scope of Work consists of following two parts: Part A - EPIC for New Cooling Water System for NGL-1/3/4 - Mesaieed: The Scope of Work includes Engineering, Procurement, Installation and Commissioning of New Cooling Water System for NGL-1, 3 and 4 mainly comprising the following facilities: a) Replace three (3) existing Cooling Water Pumps (4,800 m3/hr each) at NGL jetty with three (3) new pumps. b) Replace cement lined carbon steel cooling water header between cooling water pumps and cooling water filters with GRP header. c) Like to like replacement of one (1) cooling water filter. d) Installation of six (6) Chlorine Analyzers on cooling water supply and outfall lines from each of NGL-1, 3 & 4. Part B - EPIC for Boil off Recovery at NGL - Mesaieed: Scope of Work includes Engineering, Procurement, Installation & Co mmissioning of piping, manual isolation valves, check valves Emergency Shut down valves and the Flowmeter.
Contract Date25 Aug 2019
Contract AmountQAR 77.4 Million (USD 21.2 Million)
Qatarenergy Tender Result
Result Stage: Awarded (AOC Available)
Qatar
PORT SCHEDULING & RESOURCE MNGT SYST FOR RL & MESAIEED PORTS-Ras Laffan (RL) and Mesaieed ports are an integral part of QP and its Affiliates hydrocarbon supply chain in the State of Qatar. QP requires IT based business solution to improve the Port Scheduling & Resource Management process system for both ports that meets all its requirements as detailed in the Tender document.
Contract Date18 Aug 2019
Contract AmountQAR 7.1 Million (USD 1.9 Million)