Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date23 Dec 2023
Closing Date9 Jan 2024
Tender Amount₹ 2,00,264
Costs
EMD
₹ 4,005Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ZPHD_630551_3Bid Award Id
ViewTender No
KAM/193/2023Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
a) M 15 Grade (75mm layer)
2.64
13984
5297.26
Brick work with 1st class bricks in cement mortar
7.7
41333
5368.05
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
44
7182
163.23
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
44
1441
32.75
Ordinary cement concrete (M-20) (Mix- 1:1.5:3) with graded stone chips(20mm down) excluding shuttering and reinforcement, if any ground floor. As per IS 456-2000 (Pakur).
7.56
44845
5932
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-InCharge
26.16
5467
209
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
0.3
15948
53162.07
Supplying and laying polythene sheet (150 gm/sq.m.) over damp proof course or below flooring or roof terracing or in foundation or foundation trenches.
70.4
1689
24
Earth work in Filling in foundation or plinth by with good earth in layer not exceeding 150mm including watering and ramming by layer complete a) With earth obtained from excavation of foundation
3.52
272
77.54
Dismantling all types of masonry excepting cement concrete plain or reinforced , stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
1.65
737
447
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
2.31
2169
939
Determination of Compressive Strength of bricks as per IS: 3405 (Part I-IV)
1
920
920
Grading by Sieve Analysis of sand as per IS: 2386 (Part – I)
1
460
460
Fineness by dry sievingof cement as per IS: 4031 (Part-I)
1
280
280
Providing Display Board of size 300 mm x 300 mm made of marble fitted on the top of brick pillar (1:6) finished with plaster (1:4) & neat cement finish .
1
2000
2000
Submissin of two set of photographs for prework, during work & post work pictorial view of different stages of work.
1
200
200
Total Estimated Cost =
168034.99
168034
1
Add CGST (9%)=
168034.99
15123
0.09
Add SGST (9%)=
168034.99
15123
0.09
Total =
198281.29
198281
1
Add Cess (1%)=
198281.29
1982
0.01
Grand Total =
200264.1
200264
1
Say =
200264
200264
1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements