Zilla Parishad Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad - ZP Tender

Works
Environmental Service
Eprocure
Opening Date1 Jul 2024
Closing Date16 Jul 2024
Tender Amount₹ 12,11,989 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Page 24, It- 4 :- Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and einforcement,if any, in ground floor as per relevant IS codes. (b) River bazree

1.12

4565

4069

... More
P-43, It-38:- Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect. (only the area in contact with concrete to be measured)

5.86

1201

205

... More
P-15, It-8: Brick work with 1st class bricks in cement mortar (1:6)(a) In foundation and plinth

4.52

22129

4896

... More
P-16, It-16: 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.

3.6

2426

674

... More
P-26, It-10:- Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

1.06

5095

4807

... More
P-43, It-40:-Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc complete as per drawing and direction.(a) For works in foundation, basement and upto roof of ground floor/upto 4m (i)Tor steel/Mild Steel II.JSW/JSPL/SHYAM/SRMB/ BMASL/ ELECTROSTEEL/ SSL[As per 10th CORRIGENDA & ADDENDA dated :- 22/01/2020 FOR S.O.R OF PWD (W.B) wef 01.11.2019; P-1 & Sl. No-1]

0.1

6117

62418.99

... More
P-189, It-1:-Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or,(Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar, (c) 15 mm thick plaster

25.32

3570

141

... More
shingle 63-37.5mm

0.86

743

864

... More
Bazree 22.40 mm

0.86

814

947.25

... More
Bazree 11.20 mm

0.44

416

947.25

... More
SOR:- SECTION (B) - SANITARY AND DRAINAGE WORKS (B)-(II) SOIL PIPE AND FITTINGS Page 68, It-23:- Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 A) (i) Single Socketed 3 Meter Length b) 110 mm

10

2920

292

... More
P-70,It-23:-B)Fittings ii)Plain Tee (b)110 mm. Dia.

2

170

85

... More
(B ) SILT CHAMBER

-

-

-

... More
P-1, I-2:- Earth work in excavation of foundation trenches or drains, in all sorts of soil...as directed. complete. (a) Depth of excavation not exceeding 1,500 mm..

18.25

2176

119.27

... More
P-14, I-01:Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

24.5

7889

322

... More
Page 24, It- 4 :-Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.(b) River bazree

1.75

7120

4069

... More
P-43, It-38:- Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect. (only the area in contact with concrete to be measured)

10

2050

205

... More
P-16, It-16: 125 mm.thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.

52.5

35385

674

... More
P-26, It-10:- Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size)excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

2.5

12017

4807

... More
P-43, It-40:- Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II.JSW/JSPL/SHYAM/SRMB/ BMASL/ ELECTROSTEEL/ SSL[As per 10th CORRIGENDA & ADDENDA dated :- 22/01/2020 FOR S.O.R OF PWD (W.B) wef 01.11.2019; P-1 & Sl. No-1]

0.24

14668

62418.99

... More
P-189, It-1:- Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or,(Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar, (c) 15 mm thick plaster

45

6345

141

... More
P-192,It-15:- Neat cement punning about 1.5mm thick....

45

1530

34

... More
SOR:- SECTION (B) - SANITARY AND DRAINAGE WORKS (B)-(II) SOIL PIPE AND FITTINGS Page 68, It-23:- Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992

125

36500

292

... More
P- 70, It-23:- B) Fittings ii) Plain Tee (b) 110 mm. Dia. A) (i) Single Socketed 3 Meter Length b) 110 mm"

50

4250

85

... More
Construction of Tube well plateform for Grey Water mangement

-

-

-

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil It-2 (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling dressing and ramming the bottom, balling out water as required complete.a)Depth of excavation not exceeding to 1500mm.Platform

0.17

20

119.27

... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local.Platform

6.75

2173

322

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor P-24 as per relevant IS codes.(b) River hazree

0.51

2058

4069

... More
125 mm. thick brick work with 1st class bricks in cement mortar (4:1) in It-16 ground floor.

1.24

835

674

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course where necessary (ground floor) Extra for each additional floor.(c) 15 mm. thick plaster (6:1)

8.17

1151

141

... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cum per100 sq.m.

8.17

277

34

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 For Institution like School, AWC, HC, Office etc.LI) Nahani Trap (90 mm) @1 no./institution

3

315

105

... More
PIPELINE OF COMMUNITY LEVEL FOR GREY WATER MANAGEMENT ( XV F.C )

-

-

-

... More
Earth work in excavaion of foundation trenches or drains,in all sorts soil…including removing, spreading or stacking the spoils within alead of 75 mt as directed ……..reqd comp.(a)Depth of exacavation not exeeding 1.50 mt Pipe Line Conecting pipe line

66.25

7901

119.27

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992(A) (i) Single Socketed 3 Meter Length ,,PVC Pipes 110 mm DIA (b) 110 mmMain Line House Connecting Line

1060

309520

292

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992(B) Fittings(ii) Plain Tee (b) 110 mm

75

6375

85

... More
(iii) Door Tee (b) 110 mm

60

11700

195

... More
ix) Bend 45º (b) 110 mm

53

4717

89

... More
x) Bend 87.5º (b) 110 mm

63

7560

120

... More
xxxv) Socket Plug 110 mm

39

2106

54

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 C) Rubber Lubricant 500 ML

70

13090

187

... More
Labour for fitting and fixing U.P.V.C. pipes for above ground work including cost of jointing materials etc. fitting and fixing all necessary specials,... ... or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineerin- charge. (Payment will be made on centre line measurement of the total pipeline including specials.(B) Under ground (ii) 110 mm dia.

1060

89040

84

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 For Institution like School, AWC, HC, Office etc.LI) Nahani Trap (90 mm) @1 no./institution

69

7245

105

... More
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 .....as per direction of the Engineer-in-Charge.

4

8744

2186

... More
Leach Pit 5 H/H.

-

-

-

... More
Earch work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. Page No 1, Item No-2

37.38

4458

119.27

... More
Earth work in excavation of foundation trenches or drains, in aI) sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring.Page No-1, Item No-2

18.66

3589

192.38

... More
Single Brick FlaI Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. Page No-14, Item No-1 and 3rd corrigendum

13.2

4250

322

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree

0.96

3906

4069

... More
Brick work with 1st class bricks in cement mortar (J:4)(a) In foundation and plinth Page No-J5, Item No-7 and 3rd Corrigendum

15

77580

5172

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]. (i) With 1:4 cement mortar. (c) 1S mm thick plaster Page No-189, Item No-J and 3rd Corrigendum

7.2

1015

141

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor ect. NOTE: Cement 0.152 cu.m per 100 sq.m.

7.2

244

34

... More
Supply of UPVC pipes (B Type) & fittings conforming to 15-13592-1992. (B) Fittings (ii) Plain Tee (b) 1J0 mm

12

1020

85

... More
Ordinary Cement concrete (mix 1:1.S:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per re)e vant IS codes.

1.38

6633

4807

... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by through saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurment of finished quantity)Page No-2, Item No-04

23.76

10247

431.31

... More
Hire and labour charges for suttering with centering and neccessery staging upto 4 mtr using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, coloum, lintels, curved or straight incluing fittings, fixing and striking out after completion of works, (upto roof of ground floor) (f) 2Smm. to 30mm shuttering without staging in foundation etc.Page No 42, Item No—36

7.5

1537

205

... More
, Reinforcement for reinforced concrete work in all sorts of structuresi including distribution bars, stirrups, binders etc initial straightening and'removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 Tor steel/Mild Steel. TATA/SAUL/QRNL Page No-43, Item No-40 and Rate Analysis

0.11

7115

62418.99

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-z3s92-1992. (ii) Single Socketed 3 Meter Length. (b) 110 mm Page No-68, Item No-23- II

30

8760

292

... More
Leach Pit 3 H/H.

-

-

-

... More
Earch work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. Page No 1, Item No-2

67.47

8047

119.27

... More
Earth work in excavation of foundation trenches or drains, in aI) sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring.Page No-1, Item No-2

33.8

6502

192.38

... More
Single Brick FlaI Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. Page No-14, Item No-1 and 3rd corrigendum

21.97

7074

322

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree

1.69

6876

4069

... More
Brick work with 1st class bricks in cement mortar (J:4)(a) In foundation and plinth Page No-J5, Item No-7 and 3rd Corrigendum

24.97

129160

5172

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]. (i) With 1:4 cement mortar. (c) 1S mm thick plaster Page No-189, Item No-J and 3rd Corrigendum

13.78

1942

141

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor ect. NOTE: Cement 0.152 cu.m per 100 sq.m.

13.78

468

34

... More
Supply of UPVC pipes (B Type) & fittings conforming to 15-13592-1992. (B) Fittings (ii) Plain Tee (b) 1J0 mm

25.74

2213

86

... More
Ordinary Cement concrete (mix 1:1.S:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per re)e vant IS codes.

2.34

11248

4807

... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by through saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurment of finished quantity)Page No-2, Item No-04

46.28

19961

431.31

... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by through saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurment of finished quantity)Page No-2, Item No-04

12.87

2638

205

... More
, Reinforcement for reinforced concrete work in all sorts of structures i including distribution bars, stirrups, binders etc initial straightening and ' removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 Tor steel/Mild Steel. TATA/SAUL/QRNL Page No-43, Item No-40 and Rate Analysis

0.2

12171

62418.99

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-z3s92-1992. (ii) Single Socketed 3 Meter Length. (b) 110 mm Page No-68, Item No-23- II

65

18980

292

... More
CGTS @ 9%

1

91524

91524.55

... More
SGST @ 9%

1

91524

91524.55

... More
LABOUR CESS @ 1%

1

11999

11999.88



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.