Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad - ZP Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date24 Aug 2024
Closing Date5 Sep 2024
Tender Amount₹ 3,49,000
Costs
EMD
₹ 7,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPHD_739053_5Tender No
08/CKGP/2024-2025Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://http://alipurduarzp.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cement concrete (1:2:4) with graded stone Bazree (20 mm) excluding shuttering and reinforcement complete…..For RCC Strap Beam
0.36
1454
4006
Reinforcement for reinforced concrete work in all sorts of structure including distribution bars,stirrups,binders etc,including initial straightening and removal of loose rust cutting to reqisite length,hooking and binding to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every intersection complete..
0.06
3403
60205
Hire and labour charges for shuttering with centering and neccessary staging up to 4m ht.using approved struts,props and thick hard wood planks of approved thickness..
252.73
82894
328
Cement plaster work with materials supplied at site in (1:4): 10mm thick..
170.88
21530
126
Neat cement punning:.
170.88
5809
34
Construction of circular soak well 2.5 metre deep in all types of sandy soils with dry brick work upto 1.6 metre from the bottom having 150 mm intermediate cement brick work (1:4) band all round and cement...... brick metal (50 mm to 63 mm size) including R.C.C. cover slab of 100 mm thick with cement conc (1:1.5:3) with stone chips with necessary reinforcement and shuttering including one 560 mm dia. R.C.C. manhole .... arrangements for pipe connections, excavation of well including shoring, dewatering and removing the exess earth from the premises as per direction complete in all respect with all costs of labour and materials.With 250 mm thick dry brick work and 250 mm thick cement brick work (1:6) and 1.00m inside dia. (SAIL/TATA/RINL) (Other than SAIL/TATA/RINL)
1
15466
15466
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
1
2230
2230
Add (+) 18% of GST
1
52710
52710.18
Add (+) 1% of Cess
1
3455
3455.45
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements