Zilla Parishad Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date24 Aug 2024
Closing Date31 Aug 2024
Tender Amount₹ 2,59,231 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour for laying 150 mm.(approximate finished thickness) boulder soling including rough dressing, breaking , necessary hand packing and ramming down small stone pieces in the interstices including rolling and preparing the bed to proper level and camber with necessary cushioning over bed and ultimate filling of voids with morrum or sands or kiln rubbish including cost of all materials but excluding cost of boulder.

58.5

6816

116.52

... More
Cement concrete with 30 mm downgraded shingles shuttering, N.B. Vareity in ground floor Poportion ( 1:3:6).

5.27

17864

3393

... More
Ordinary cement concrete ( mix 1:2:4 ) with graded stone chips ( 20 mm ) down Bozree

24.04

96304

4006

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.

0.28

15842

57608

... More
Providing form work and staging so as to give smooth concrete surface finish including hire and labour charges for the same for bridges and culverts including stripping off and removing after completion of works and providing necessary Batter, curved surface etc. all complete. a) Form work with timber plank in Well steining, kerb, components of Pier, Abutment, retaining wall, Wall of Box Culvert type bridges, vertical and inclined sides of superstructure other than hollow box type bridges, parapet kerb, road kerb, rail post, cable tray cover etc.

182

38948

214

... More
Providing weep holes(150 × 75 mm.) in abutment or wing wall for the entire thickness, with slope 1:20 towards drainage surface, including packing different size of brick bats or boulders of approved quality and size at the back side as per direction of Engineer-in-charge

24

2760

115

... More
Plaster with sand and cement mortar including rounding off corners of chamfering corners as directed and including racking out joints or roughening concrete surface, curing with cost and carriage of all materials. a) With 4:1 cement mortar i) 10 mm. thick plaster 1)Vertical side of walls, 2) Top of side walls, 3) R.C.C. Cap, 4) Wheel Guards, 5) Vertical side of R.C.C. Slab

117

18018

154

... More
Neat cement punning on cement plaster surface 1)Vertical side of walls, 2) Top of side walls, 3) R.C.C. Cap, 4) Wheel Guards, 5) Vertical side of R.C.C. Slab

117

3978

34

... More
Providing & fixing Concrete Sign Board as per IRC ecification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layerIRC febric (75 x 75 mm.mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement,concretshuttering, nuts & bolts, washer etc. complete.)

1

2245

2245

... More
Add 9% SGST

1

19576

19576.1

... More
Add 9% CGST

1

19576

19576.1

... More
Labour welfare cess 1%

1

2566

2566.64



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.