Zilla Parishad Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad - ZP Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date4 Sep 2024
Closing Date18 Sep 2024
Tender Amount₹ 3,28,219 
Notes
Download

Costs

Summary

Construction Of Cc Drain From Akbar Ali House To The House Of Ajijul Miya At Part No 12/ 38 Under Patlakhawa G.p With In Apd-1

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.

31.46

123460

3925

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(i) Tor steel/Mild Steel

0.02

1204

60205

... More
Hire and labour charges for shuttering with ceupto 4 m using approved stout props and thick thickness with required bracing for concrete lintels curved or straight including fitting, fcompletion of works (upto roof of ground floor),25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge

268.8

55104

205

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](i) With 1:6 cement mortar (b) 20 mm thick plaster Neat cement punning about 1.5mm thick sill, floor etc.

163.2

25622

157

... More
NOTE:Cement 0.152 cu.m per 100 sq.m.

163.2

5548

34

... More
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm .thick made with RCC 1:1.5:3 with pakur varity stone chips reinforce with doubale layer IRC febric (75 x 75 mm.mesh )and fix with necessary nuts & bolts on two RC precast post 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm.and 1.90 metre above GL. & 0.75 metre below GL.including digging hole, repaking the same with cement concrete 1:3:6with jhama khoa or with local stonechips etc. complete including paintig two coatson both faces lettering sign marks etc.s per direction of the Engineer-in-Charge .(The rate is inclusive of cost reinforcement ,shuttering ,nuts,& bolts, washer etc. complete.)

1

2230

2230

... More
ADD GST @18%

1

49571

49571.87

... More
Labour welfare Cess @ 1 %

1

3249

3249.71



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.