Water Resources Development Directorate Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Water Resources Development Directorate - WRDD Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date29 Oct 2024
Closing Date12 Nov 2024
Tender Amount₹ 1,22,564 
Notes
Download

Costs

Summary

Surging And Development With Chemical Treatment Of Panchpota Dtw And Construction Of Boundary Wall Of Banamalipara Dtw At Chakdaha Block Of Nadia District Under Kalyani (ai) Division Under Sarasari Mukhamantri (core Sector) Programme For The Financia

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
b) Calcium Hypochloride

20

70

1414.4

... More
c) Hexamata Phosphate

20

80

1603

... More
Labour charges for pouring acid in requisite quantities in perforated cotton bag & submerging the bags within the tubewell at differeft stages of strainer with the help of string over night, weeping and their mixing and string the acid with surge block by air Compressor ( including back pressure) L.S.

1

1471

1471.94

... More
Development of tubewell with 350 cfm 150 psi capacity air compressor by surging and backwashing for minimum 15 hrs including lowering of eduction pipe, air pipe etc. upto required depth as per direction of Engineer-in-Charge including hire and transport charge of Air compressor and other necessary tool and plants and also cost of fuel/lubricants for air compressor.

48

1091

52413.12

... More
Labour charges & other charges for lowering of drop pipe 7.5 cm. or 10 cm. dia for choke clearance & detection of parted point (for parted tubewell) on fitting necessary flanges buckets & other attachment as may be required & withdrawing of the same after completion of work as many lifting & lowering required during the work without damaging any departmental material includinglowering of sounding wire time to time as and when required. This includes labour & other charges for erection of scaffolding for lowering & withdrawing drop pipe. (i) Upto 60 metre depth.

60

41

2489.4

... More
(ii) Beyond 60 metres upto 150 metres.

70

45

3168.2

... More
Labour charges & other charges for clearing of parted particle like sand and gravel & foreign materials like brick bats etc. if any from inside the tubewell assembly from different depth adopting suitable method including use of suitable type of cutter for loosening & breaking the deposited materials on subsequent operation of air compressor of suitable capacity with gradual & time to time lowering of compressor pipes, drop pipes etc. for required hours till the chockage is cleared upto the satisfaction of Engineer-in-Charge. (The rate included all labour charges & running cost of machinery but excluding lowering of drop pipe & other tools and plants but included labour charges for lower cutter, air pipe etc. to the required depth as needed. (ii) Beyond 60 metres upto 150 metres

3

285

857.13

... More
Instalation of submersible electro motor pumping set of following capacities by using necessary requisite, tools and plants by lowering the same within the tubewell housing pipe upto the following depth as per direction by fitting, fixing column pipes and other accessories, fixtures with necessary nuts, bolts and washers and suspending the entire assembly of pump set vertically by fixing the same supported by M.S. clamps over the top of housing pipe, binding the motor cable with each column pipes and drawing cable upto pump controller/starter point including opening out of the top cap of housing pipe of the tubewell and testing of motor both in loading as well as in unloaded condition before and after installation of the same. (The rate is inclusive of hiring charges of tools & plants.) (a) 100/150/200 cubic metre her hour capacity electro motor pumping set. (ii) Length of pump assembly of any length exceeding 18 metre length.

1

1510

1510.61

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.

4.7

119

560.57

... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth.

2.44

361

880.84

... More
Ordinary cement concrete mix 1:2:4 with graded stone chips 20mm nominal size excluding shuttering and reinforcement if any in ground floor as per relevant 1.5 code.

0.24

5695

1389.64

... More
[ A ] Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth(G.Floor)

2.63

5413

14209.13

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (a) 20 mm thick plaster [Gr floor )

17.55

175

3071.25

... More
Neat cement punning about 1.5mm thick in wall,dado,window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

17.55

34

596.7

... More
Labour charges for fitting, fixing and laying where necessary of following M.S/ G.I. pipes & accessories (to be supplied departmentally) including transportation of the same and cutting, threading, jointing and making leak-proof threaded / flanged joint at site by using socket / rubber insertion, nuts & bolts etc maintaining proper alignment and level all complete as per direction of Engineer -in Charge. i) 350 mm dia M.S. ERW pipe

1

134

134.84

... More
(b) Gas cutting to required size of 5 mm thick M.S. plate NSC channel etc. including labour charges, hire charges for all tools and plants. (i) 350 mm dia M.S./G.I. pipe ( Housing Pipe )

1.1

234

257.17

... More
(c) Electric welding charges of 5 mm M.S. plate M.S. channels etc. and other member including hiring charges of all tools and plants. (i) 350 mm dia M.S./G.I. pipe ( Housing Pipe )

1.1

547

601.15

... More
Supply of gravel for use as pack in tube well of 2 mm to 4 mm. size and gravel treatment of tubewell (as per IS: 4097) including screening, washing, cleaning etc. of the gravels at the site, all complete as per direction of the Engineer-in-Charge. ii) For site at any district of West Bengal upto 180Km distance from quarry

3.15

3885

12239.32

... More
ADD GST @ 18% [ Except Sl No 3 ]

1

17796

17796.31

... More
ADD LABOUR WELFARE CESS @1%

1

1213

1213.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.