Water Resources Development Directorate Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Civil And Construction
Excavation
Water Storage And Supply
Eprocure
Opening Date16 Oct 2023
Closing Date5 Dec 2023
Tender Amount₹ 32,08,703
Costs
EMD
₹ 64,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WRDD_592566_1Bid Award Id
ViewTender No
WBWRDD/E.E. (A-I)/COB/RIDF-XXIX/e- NIT 06/2023-24Tender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
d) beyond 9m up to 12 m below ground level.
6
8706
1451
... More
Extra rock cutting over the corresponding rate for digging for the respective internal diameter of the well will be allowed on the different stage of depth. b) 100% extra in laterite rock or sand stone cutting with chisel and jumper, but not requiring blasting. a) Up to 3 m below ground level.
18
21942
1219
... More
b) beyond 3 m up to 6 m below ground level.
18
22806
1267
... More
c) beyond 6 m up to 9 m below ground level.
18
24030
1335
... More
d) beyond 9m up to 12 m below ground level.
6
8706
1451
... More
Supply and transportation of precast reinforced cement concrete ring [1500 mm internal dia, 100 mm thick and 250 mm hight ] with necessary reinforcement including shuttering, curring etc. and carrying it to the site and also including the cost of all labours for fitted and fixed in position after proper curing true to plumb in the well including jointing with cement morter 1:2 complete as per direction.
270
450360
1668
... More
Washing and development by pumping with 30 cum per hour capacity pump for a period till sand free water comes out and the discharge is about 30 cum per hour, followed by final yield test; inclusive of all tools, plants and scaffolding and hire charge of centrifugal pump set and other fittings as necessary all complete.
6
9448
1574.73
... More
Supplying 80 mm dia. G.I. Tail Piece suitable for connecting Hose Pipe with Pendent Tee and suction side of pump.
6
594
99.01
... More
Supplying 80 mm dia. P.V.C. Hose Pipe of approve make and brand.
54
7383
136.73
... More
Supplying 80 mm dia. Heavy type Hose clamp.
12
169
14.14
... More
Supplying, fitting and fixing an transportation of 80 mm NB CI swing type IS: 4038/86 certification mark screwed end foot valve.
6
8676
1446
... More
Supply and transportation of 65 mm dia (Medium Quality) 90 degree G.I. Delivery bend and 65 mm dia G.I. Tail piece including fitting fixing in proper position as per direction of E.I.C.
6
1158
193
... More
Solar Module: Supply , transport , installation and commissioning of ISI marked as per IS 14286 and IEC 61853(1), 61730(1&2), 61710 certified Solar Module of Multicrystaline/Monocrystalline/ Monocrystalline PERC/bifacial cell with min. efficiency of 15% and fill factor more than 70%, laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2/4.0 mm tempered glass , framed in anodized aluminium frame .The power output of individual PV modules used in the PV array, under STC, should be a minimum of 300 Watt peak, with adequate provision for measurement tolerances.Modules supplied with the SPV system should have warranty for output wattage, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. Necessary test certificate also to be supplied. a) For 3 HP Off-grid Solar Water Pumping System with Multicrystalline SPV modules - 3200-3300 Wp.
19500
578370
29.66
... More
Module Mounting Structure ( For 2HP, 3HP and 5HP Solar Water Pumping System): Supply , transportation & installation of G.I manual tracking structure made of MS hollow sections, pipes, plates, angles etc as per IS 1161/1239, 1079/2062, to hold min 300 Wp SPV Module as per drawing and specification of MNRE . The steel structure is to be protected with minimum 80 micron galvanisation(hot dip) and provided with dual axis manual tracking arrangement three times in a day and seasonal tilting are to be regulated to face the sun optimally. The weight of the Module Mounting Structure holding 4 Modules should not be less than 165Kgs, holding 5/6 Modules should not be less than 235 Kg and holding 7/8 Modules should not be less than 265 Kg.
2460
356700
145
... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing. a) For 4 module structure.
6
68184
11364
... More
b) For 6 module structure.
6
60672
10112
... More
Power conditioning unit with IP54 enclosure : b) For 3 HP capacity Pump-motor set
Supply , transport , installation and commissioning of IP 54 protected enclosured Inverter Unit qualifying IEC 61683-Efficiency measurement and IEC 60068-2-Environment Standard , safety standard suitable for 3 Phase A.C. motor, IGBT based high voltage switching inverter with MPPT technology, to take care of the variation of Sun light and will be suitably mounted inside the metal enclosure. Inverter should have protection against Dry run, Over current, Under current, Over voltage, Under voltage, Short circuit etc. System should be able to run at low sunshine and minimum 7 to 8 hours a day run should be possible during normal unshine.condition. Inverter should have option to auto start for any short trip off due to low light/ cloudy situation except for dry run. Inverter should be provided with a display to show the various parameter by the user such as Voltage, Current, Solar panel DC voltage, Inverter IGBT temperature, Out put AC voltage, Output frequency, Pump flow (direct or calculated method), Irradiation etc . The system should store the data at a set interval, be capable to transfer it to external storage device and support communication of its operational parameters and logs over Modbus protocol . It should also monitor and save total run time, total water pumped etc .There should be provision for interfacing GPRS based data transmission.
6
241500
40250
... More
Cable and Accessories :
Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc. i. 4.0 Sq mm single core multi studs - 10 Mtrs (Minimum) ii. 6.0 Sq mm single core multi struds -5 Mtrs (Minimum) iii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc. b) For 3 HP per structure.
12
41208
3434
... More
Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.
12
31932
2661
... More
Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages.
120
1560
13
... More
a) Lighting System at Scheme: (with lightine Pole) :
Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hot dip galvanised 80 mm x 50 mm, medium duty pipe, with 12 V, ISAh 2-in-l Lithium ion/ Ferro- Phosphate battery with in-built 7-11 watt LED lamp , 50 Wp solar panel to cover the scheme area. The lighting system should be warranted for Syears from the date of installation.
6
114180
19030
... More
Lightning protection (Pol~ mounted): Lightning ptotection with 31f X 1.S" 0.1 pipe of 5m + I m height with base ftange in proper RCC foundation and S & F Lightning Conductor Air Terminal madeof20 mm dia 1000 mm long GI pipe (ISJ Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick 01 base plate at bottom incl. necessary holes etc. Earthing with 65 mm dia GI pipe (Mediwn) 3 .0 Mts. long and l x 19/ lO stranded G l (Hot Dip) wire ( 4 Mts. long), 20 mm dia x J 25 mm long galvanized bolt. double nuts, double washers-including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 6S mm dia GI pipe (ISi-Medium) protection (3 Mts. long) to be filled with bitumen partl)' under the ground level and partly above ground level to an average .depth of3.65 Mts. including connection to earth electrodes with 25 X 6mm G.I strip. (Provision of one lightning protection for each scheme as per drawing)
6
64098
10683
... More
Supply and installation of 3 phase electromotor pump-motor set suitable for Solar operation covering 5 years warranty for the following conditions including loading, unloading, transportation etc.:- b) 3 HP ISI marked 3 phase surface mounted Monoblock Pump-motor having discharge at required head as below::- i) Surface Pump-motor set for STW, ISi marked as per IS·: 9079 with di"hatge of 6.50-7.14 Lps at J6 mts. total head with foot valve, required quantity offlexible suction pipe( I Sm), clamps, bend, footvalves and all other accessories to complete connection of suction and delivery side.
6
241398
40233
... More
Testing and commissioning of scheme after completion of all work.
6
12000
2000
... More
Comprehensive maintenance charges for 4 years beyond 1 year warranty period (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time). b) For 3 HP surface pump.
19500
78000
4
... More
Insurance @ 2% for a period of 5 years.
1
23508
23508.96
... More
Supplying, fitting and fixing including transportation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.
1
3677
3677.51
... More
a) Construction of Pump-motor shed of height 0.85m(as per drawing) with Hot dip Galvanised ISA 25X25x3 & 1.5mm MS sheet including foundation Base of 0.95m x 0.65m for Pump Unit ( BFS, .075mm 1:2:4 PCC, 100mm 1:1.5:3 CC) - For 2HP and 3HP surface pump.
6
29790
4965
... More
75 mm dia Lay Flat Hose (Non ISI).
600
67200
112
... More
Extra transportation @ 2% as applicable for the district of Malda, Uttar Dinajpur, Jalpaiguri, Coochbehar & Alipurduar.
1
19297
19297
... More
Campaining in the command area of clustered STW Sub-projects by community workers for mass awareness, capacity building to achieve sustainability of sub-projects. Cost include wage payment to community workers, transportation, leaflet etc.
2
5200
2600
... More
Demarcation of command area, selection of beneficiaries and preparation of land schedule within one cluster having CCA 36 Ha.
1
5000
5000
... More
Meeting Cost for WUA formation, cost including Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charges.
1
3000
3000
... More
Registration Cost for WUA under suitable act (Society) deed writing including registration charge, conveyance cost and opening of bank account etc.
1
1200
1200
... More
Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge ( rate on meeting ).
4
12000
3000
... More
Meeting and onsite demonstration for operation & maintenance of tubewells, water management and mode of collection of water tax, building of corpus fund etc.
2
6000
3000
... More
IEC Materials ( Leaflet, poster, notebook )= 8 meetings.
100
3500
35
... More
Documentation Cost for activities of WUA Scheme - by still photography, report booklet etc in both hard and soft copy.
1
1000
1000
... More
GST 18%
1
474431
474431.98
... More
LABOUR CESS 1%
1
31338
31338.23