University Of Calcutta Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
University Of Calcutta - CU Tender
Civil And Construction
Building Construction
Eprocure
Opening Date1 Feb 2024
Closing DateCancelled
Tender Amount₹ 4,97,424
Costs
EMD
₹ 9,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CU_658707_1Tender No
E-tender/Eng/CT- 580/23-24Tender Authority
University Of Calcutta ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation(a) 1:3:6 proportion
13.5
64273
4761
Artificial stone in floor, dado, staircase etc with cement
concrete (1:2:4) with stone chips, laid in panels as directed
with topping made with ordinary or white cement (as
necessary) and marble dust in proportion (1:2) including
smooth finishing and rounding off corners including raking
out joints or roughening of concrete surface and application
of cement slurry before flooring works using cement @ 1.75
kg/sq.m all complete including all materials and labour.
In Ground floor.
3 mm. thick topping (High polishing grinding on this item is
not permitted with ordinary cement).
Using grey cemen (iii) 35 mm. thick1st floor
55
18535
337
Replacing wooden beam or R.S. joist by R.S. joist or by another wooden beam joist and fixed complete, including hire and labour charges for necessary sal bullah props,necessary packing between beams and burgahs but excluding the cost of joist or wooden beam and concrete/Brick works etc needed for mending damages(i) Height not exceeding 5m. (a) Clear span not exceeding 3.7m.
5
12625
2525
M.S. works in brackets made from flats, angles, tees etc. to sizes
specialy bent, twisted, forged; making holes drilled and fitted to
rafter of trusses with necessary bolts, nuts, washer or screws etc.
(length of straight not less than 230 mm)
1850
184704
99.84
Welding in M.S. structural work with gas or electric:(a) Tack weld
60
540
9
(b) Continuous weld.
2000
18000
9
Dismantling the iron structures , tee joists etc by (a)Welder
15
5370
358
Welder (Helper)
15
5280
352
Making one set of scaffolding only for replacing glass panels, painting,
uprooting plant and another repairing works of building and S&P works for
external works only with 10 cm. dia bamboo as main posts at the rate of 1
metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting
and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge.a) 3.90 metre height
40
11160
279
GST 18 %
1
75878
75878.19