Public Works Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Works Department - PWD Tender
Electrical Goods and Equipments
Machinery and Tools
Electrical and Electronics
Eprocure
Opening Date5 Jan 2024
Closing Date23 Jan 2024
Tender AmountRefer Documents
Costs
EMD
₹ 28,343Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WBPWD_638049_1Bid Award Id
ViewTender No
WBPWD/EE/S24PED/eNIT61/2023-24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://keralapwd.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Copper Refrigeration pipe line for Suction Line (5/8" OD with 0.6mm thick) with proper supports & brackets for 2TR Hi-wall Split AC as directed by EIC.
(Make: Ryoku/Uniflow)
140
-
-
Supply & Fixing Pipe Insulation for Liquid Line (1/4" OD with 9 mm thick) with proper insulating for 2TR Hi-wall Split AC as directed by EIC.
(Make: Accroflex/Suprime)
140
-
-
Supply & Fixing Pipe Insulation for Suction Line (5/8" OD with 9 mm thick) with Proper insulating for 1.8/1.5/1.0 Tr Hi Wall Split air Conditioner as directed by EIC. (Make: Accroflex/Suprime)
140
-
-
Control Cabling from Condensing Unit to Control Panel 3 Core 2.5 sq. mm. Communication Cable 2TR Hi-wall Split AC, as directed by EIC. (Make : Polycab/KEI/Finolex)
140
-
-
Supply & laying Soft Drawn PVC Drain Pipe 19mm dia with proper supports & brackets as per direction EIC. (Make: Suprime/Oriplast)
140
-
-
Note: 1) All the above rates should be quoted inclusive of all taxes & duties, District charges and LWC as applicable, with cost of maintenance, servicing, supply & replacement of spares for 1 (One) year from the date of commissioning.
2) The Agency must procure the materials from the manufacture/OEM or their authorised sales Channel so that the standard warranty/support of the manufacturerer/OEM becomes applicable to the product to be delivered and installed by them. Documents that authenticate such procurement from the manufacturer/OEM or from their authorised sales Channel and standard warranty/support should be sent from the e-mail of Engineer-in-Charge and hard copy of it to be submitted during execution of work/submission of bill. If any refubrished materials are supplied and installed, penal action will be taken as per existing rule. Before execution of the work the prospective bider has to submit layout drawing as per design of OEM dully approved by the OEM. 3) Total is rounded off to the nearest rupees.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements