Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date14 Aug 2024
Closing Date9 Sep 2024
Tender Amount₹ 1,83,42,240.94 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 3,79,403Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Extension Of Sewerage Network By Providing 200mm, 500mm And 600mm Dia Sewer Line At Street No 718 At Aa-iig Under Ntk Project (part-b) Under Newtown Kolkata Water Supply Division-ii, P.h.e. Dte.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_734295_2Bid Award Id
ViewTender No
PHE /NTKC/SE/NIeT-03/2024-2025Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
(c) Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary.
1460
342662
234.7
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).
Note: Payment will be made as per actual requirement and consumption in the field.
(a) Depth upto 1.5 m.
4110
1586460
386
(b) For additional depth beyond 1.5 m. and upto 3.00 m
4110
1804290
439
(c) For additional depth beyond 3.00 m.
1620
806760
498
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
1560
563160
361
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation
1580
330220
209
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety
410
2284725
5572.5
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety
60
367181
6119.69
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL
7.9
434571
55009
Providing and Laying including supply Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD.
Note: i) Payment will be made as per actual requirement and consumption in the field. ii) 25 % payment against this item will be with held till hydraulic test of pipeline is done as provided separately.
i) 200 mm dia (Rate analysis as per PWD Schedule)
270
146124
541.2
ii) 500 mm dia (Rate analysis as per PWD Schedule)
1010
2321283
2298.3
iii) 600 mm dia (Rate analysis as per PWD Schedule)
90
262324
2914.72
Brick work with 1st bricks in cement sand mortar (1:6)
(a) In foundation and plinth
240
1299120
5413
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(ii) With 1:4 cement mortar
(a) 20 mm thick plaster
2110
409340
194
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
1410
47940
34
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation.
7980
618769
77.54
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D)
i) 35 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size
Cover: 700 mm X 100 mm
Frame: 910 mm X 185 mm
opening: 560mm
Weight: 245 kg (approx)
37
149258
4034
i) 15 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size
Cover: 460 mm X 75 mm
Frame: 620 mm X 150 mm
opening: 360mm
Weight: 100 kg (approx)
24
60864
2536
Supplying, fitting and fixing in position of PVC Foot Step (Heavy) at different manhole.
182
45099
247.8
Hire charges of JCB.
50
50000
1000
Bailing out water by pumping including all leads and lift and including making all arrangements for disposal, where comforming flow or swapage of water is encountered and ratings of pumps and hours of operation is specially assertained as per direction of E.I.C.
20000
276000
13.8
After Addition of GST @ 18% on (Sl No. 1 to 17) i.e. Rs. 15917228.40 = Rs. 2865101.11
1
2865101
2865101.11
After Addition of CESS @ 1% on (Sl No. 18) i.e. Rs. 18782329.51 = Rs. 187823.30
1
187823
187823.3