Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Aug 2024
Closing Date16 Aug 2024
Tender Amount₹ 4,99,376
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_728183_1Bid Award Id
ViewTender No
KMC/ASPH/PB/SM-02/24-25Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cement concrete with graded jhama khoa (30 mm size) excluding
shuttering In ground floor and foundation.
(a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 &
3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10)
8.44
40170
4761
Water Bound Macadam Sub Base by consolidating Jhama metal /
Laterite chelly or stone metal / shingles of specific size in hard crust
to requisite thickness (measured after compaction) in layers including
screening of metals etc. as necessary, hand packing, sweeping,
watering and rolling in stages with power roller to proper line, grade
and camber, lighting, guarding & barricading and making necessary
earthen bundh of one metre width on each side where necessary to
protect edges and preparing the bed by necessary cutting or filling
and rolling all complete including the cost of all materials and hire and
labour charges of all men and machineries and compacting to the
required density, as per Clause 404 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal /
Laterite (63 mm to 45 mm) (Moorum replaced with course sand)
( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 &
page-222 sl. No- 1 & 5 (e))
42.19
109553
2596.83
Lowering manhole cover and frame with CBW (1:4), 250 mm thick up
to 100mm high with 20mm thick sand and cement plaster including
finishing with neat cement after cutting the asphaltum pavement and
taking out and re-fixing the existing manhole cover and frame with
cement concrete (1:1.5:3) with stone chips all round the frame
surface including removal of surplus spoils. ( Ref :Rate based on
PWD Current SOR,
PWD(R&B) 2018, p-
12
23975
1997.93
Raising manhole cover and frame with CBW (1:4), 250mm thick up to
100mm high with 20mm thick sand and cement plaster including
finishing with neat cement after cutting the asphaltum pavement and
taking out and re-fixing the existing manhole cover and frame with
cement concrete (1:1.5:3) with stone chips all round the frame
surface including removal of surplus spoils. ( Ref :Rate based on
PWD Current SOR,
PWD(R&B) 2018, p-
4
8280
2070.03
Raising gully pit cover and frame with CBW (1:4), 250 mm thick up to
100mm high with 20mm thick sand and cement plaster with neat
cement after dismantiling the existing setting and taking out and
refixing the existing cover and frame with cement concrete (1:1.5:3)
with stone chips all round the frame surface including removal of surplus spoils.
11
20419
1856.28
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION
PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in
position reinforced cement polymer concrete manhole /gully pit cover
with matching frame.As per I.S-12592(M.D) (ii) 25 MT load bearing
capacity round manhole cover provided with two lifter hooks fitted
with matching frame of size Cover: 680 mm X 90 mm Frame: 800 mm
X 16.5 mm opening: 500mm Weight: 196 kg (approx)
4
13528
3382
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION
PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in
position reinforced cement polymer concrete manhole /gully pit cover
with matching frame.As per I.S-12592(M.D) (viii) 5 MT load bearing
capacity gully pit cover with frame and hinge arrangement for opening
of size (viii) 5 MT load bearing capacity gully pit cover with frame and
hinge arrangement for opening of size Cover: 470 mm X 420 mm X
80 mm Frame: 590 mm X 550 mm X 170 mm opening: 380mm x
305mm Weight: 100 kg (approx)
4
8004
2001
Resetting of Stone Slabs of kerb & channel of road side drain to
correct line and level including cement pointing (1:2).
b) flat channel stone. ( Ref :Rate based on PWD Current SOR.
[PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])
250
4575
18.3
Supplying and laying factory made vertical kerb stone of cement
concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 300mm
X 150mm tapered at top, making joints with cement mortar (1:4)
incldg cost of all materials and labours but excluding the cost of under
bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current
SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3
and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 ,
p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it
-18.05)), Chapter-
500
132770
265.54
LABOUR FOR PREPARATION OF SURFACE BY SCRAPING
CLEANING & BRUSHING SPREADING HOTMIX INCLUDING
LABOUR FOR LAYING TACK COAT (EMULSION BITUMEN WILL
BE SUPPLIED BY DEPT) AND ALSO COMPACTION OF HOTMIX
BY ROAD ROLLER (ROLLER WITH OPERATOR WILL BE
SUPPLIED BY DEPT.)
562.5
8735
15.53
(b) Priming one coat on timber or plastered surface with synthetic oil
bound primer of approved quality including smoothening surfaces by
sand papering etc. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No. 200)Painting with best quality synthetic enamel paint of approved make
and brand including smoothening surface by sand papering etc.
including using of approved putty etc. on the surface, if necessary :
(a) On timber or plastered surface :
(ii) Two coats
87.5
3325
38
Painting with best quality synthetic enamel paint of approved make
and brand including smoothening surface by sand papering etc.
including using of approved putty etc. on the surface, if necessary :
(a) On timber or plastered surface :
(ii) Two coats (white in shade) ( Ref :PWD (Bldg.)-2017, It. No. 2,
Page No. 200)
87.5
6825
78
Removal of rubbish,earth etc. from the working site and disposal of
the same beyond the compound, in conformity with the Municipal /
Corporation Rules for such disposal, loading into truck and cleaning
the site in all respect as per direction of Engineer in charge. ( Ref
:PWD (Bldg.)-2017, It. No. 13, Page No.12)
56.25
9337
166
Sub Total
-
-
-
GST 18%
1
75422
75422
CESS 1%
1
4944
4944.31
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements