Irrigation And Waterways Department Tender

... More
The Irrigation And Waterways Department has issued a formal invitation for competitive bids for Wbiw/se/wc-ii/nit-01e/2019-20, Sl 11 in West Midnapore, West Bengal, with an estimated contract value of Rs. 1,93,27,821. The bid opening date for this tender is 29-05-2019 and the last date for bid submission is 28-06-2019. Interested bidders for Irrigation And Waterways Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Irrigation And Waterways Department Tender

Opening Date29 May 2019
Closing Date28 Jun 2019
Tender Amount₹ 1,93,27,821 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Wbiw/se/wc-ii/nit-01e/2019-20, Sl 11

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra rate over Item no. -1 for all kinds of soil for every additional lift of 1.50 metres or part thereof beyond the initial lift of 1.50 metre. 1 (one) no extra lift

13901.79

-

13.57

... More
Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces )

-

-

-

... More
b) 1.20 metre x 0.90 metre nominal section

900

-

787.32

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, ncluding setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge. I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iv) Without pumping out water shoring.

985.91

-

128.96

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety, Using concrete mixer

28.6

-

6219.02

... More
Labour charges for boulder pitching on top and slope by placing required boulders (each weighing 20 kg and above within leads of 100 metres and all lifts) including filling the interstices with fragments as required, preparing the subgrade by cutting or filling the earth on slope upto 7.5 cm. depth , watering and ramming where neceesary complete as per direction of the Engineer -in- charge. a)Over Jhama khoa/metal filter/Geo textile filter

2689.37

-

566.73

... More
Supply of stone/ laterite boulders at site each weighing 20 kg and upto 40 kg including cost of material, loading, unloading and carriage and including all incidental charges like Royalty complete. (Royalty certificate in original fromcompetent authority are to be submitted along with the bill, otherwise amount due towards Royalty of stone/ laterite boulder will be deducted from the bills of works.) Laterite boulder

4973.57

-

1424.19

... More
Supplying at site and laying in position UV stabilized needle punched, stapled fibre / continuous filament polypropylene non-woven geotextile of 300 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top. 2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. a) Over Jhama khoa/ metal filter/ Geo textile filter

19920.34

-

220.58

... More
Extra rate over item no -11 for carrying boulder by head load for each additional lead of 50 metre or part thereof beyond initial distance of 50 metre, upto a distance of 200 metre 1 no lead

2984.14

-

31.67

... More
h) 0.60 metre x 0.45 metre nominal section

1493.18

-

337.1

... More
Labour charge for dumping / laying of Laterite / Stone Boulders / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges. (a) Boulder 20kg & above where boats are not necessary.

1388.57

-

229.63

... More
Extra rate over item no -1 for all kinds of soil for every additional lead of 30 metres or part there of beyond the initial lead of 30 metre. 1 (one) no extra lead

9929.85

-

13.57

... More
Labour charges for stacking unloaded boulder / shingles to make them convenient for measurement as per direction of the Engineer-in-charge. A)Boulder of size above 20 kg

1388.57

-

80.32

... More
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67. (The payment is to be made on the basis of the finished compacted volume of moorum.)

281.25

-

958.78



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.