Inland Waterways Authority Of India Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Inland Waterways Authority Of India - IWAI Tender
Aerospace and Defence
Eprocure
Opening Date10 Jul 2024
Closing DateCancelled
Tender Amount₹ 10,00,000
Costs
EMD
₹ 20,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IWAI_815847_5Bid Award Id
ViewTender No
IWAIKo-150MN14/1/2024-25Tender Authority
Inland Waterways Authority Of India ViewPurchaser Address
-Website
http://https://iwai.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender document for Annual afloat repair of 5 nos. IWAI vessels namely WB Chandramallika, TUG Trisul, CSD ID IV, AB Dhawalgiri, AD Falgu for the year 2024-25
BOQ Items
Complete overhauling of dredge pump unit with renewal of spares such as impeller, seals, bearings, safety valves and other acessories is to be done as required after opening the pump.Dredge pump casing needs to be repaired and be made leak proof by providing necssary sealing material(plastic carbide or other means) to ensure efficient working as required as per direction of EIC/surveyor.Also, necessary mandatory spares are to be provided as per direction of EIC/surveyor.
-
-
-
Labour charges
1
137500
137500
Cost of spares ( Actual bill/invoice + 10%)
-
-
-
Servicing of propeller unit of the vessel by renewal of required spares like shaft, bearing, seal, spares of hydraulic motor etc to make operational and leak proof. If requires propeller guard's welding, riveting, boltening etc with renewal of fasteners and other necessary spares is to be done as required as per direction of EIC/surveyor.
-
-
-
Labour charges
1
82500
82500
Cost of spares ( Actual bill/invoice + 10%)
-
-
-
Cleaning and Servicing of the heat exchanger of main engine & hydraulic cooler with motor system as per applicable methods and renewal of required spares as required as per direction of EIC/Surveyor.
-
-
-
Labour charges
1
44000
44000
Cost of spares ( Actual bill/invoice + 10%)
-
-
-
Grease pump & all grease lines to be checked and serviced/repaired with renewal of its pipe, adaptor, nozzle, tube, coupling nut, connector, screw sleeve, coupler and nipple etc as required as per direction of EIC/ Surveyor.
-
-
-
Labour charges
1
55000
55000
Cost of spares ( Actual bill/invoice + 10%)
-
-
-
It is reported that all moving joints in the boom (total 16no. Joints ) having slippage, play and unable to sustain load and movement. And it is reported that there is crack in boom body. The same as to be rectified with replacement of bush, baring, pin, eye, plate and spare etc as required as per direction of EIC/surveyor.
-
-
-
Labour charges
1
88000
88000
Cost of spares ( Actual bill/invoice + 10%)
-
-
-
It is reported that 06 nos. metal doors are damaged from bottom. Same to be repaired with changing the rubber packing/gasket as required as per direction of EIC/surveyor.
-
-
-
Labour charges
1
22000
22000
Cost of spares ( Actual bill/invoice + 10%)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements