Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date25 Nov 2024
Closing Soon6 Dec 2024
Tender Amount₹ 3,24,099
Costs
EMD
₹ 6,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GTA_773030_1Tender No
03/GOKE-II/15FC/2024-25Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cost of stone boulder 150 mm size delivered ans stacked at site.
0.86
1526
1312.7
(I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering.In ground floor.
-
-
-
(B) With N.B variety stone metal.
-
-
-
(a) 1:3:6 proportion.
0.58
5971
3463.3
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
-
-
-
(i) (1:3:6) proportion.
5.76
3964
22837.25
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
-
-
-
(b) River bazree.
3.64
6370
23189.71
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
-
-
-
(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.
-
-
-
JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel
0.57
77113
44062.48
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
-
-
-
( c ) 9 to 12 mm. thick approved quality ply board shuttering in any concrete work.
43.32
448
19442.02
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
-
-
-
(ii) With 1:4 cement mortar .
-
-
-
(a) 20 mm.thick plaster.
40.74
247
10070.93
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
18.52
40
755.62
Labour for fitting and fixing high density poly-ethylene pipes or P.V.C. pipes for above ground work including costs of jointing materials, paints etc.fitting and fixing all necessary specials, cutting pipes, making threads, cutting holes in walls of R.C. floor where necessary and mending goods all damages excluding the cost of masonry or concrete work, if necessary ,but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge.(Payment will be made on center line measurment of the total pipeline including specials.) .
-
-
-
Above Ground .
-
-
-
20 mm dia.
1230
32
39852
Supply of High Density Poly-ethylene Pipe conforming to IS-4984-1985 (Dia)[PE-63].
-
-
-
6 Kg/Sq.Cm (Dia) (Working Pressure).
-
-
-
20 mm dia.
1230
86
106272
GST
1
48949
48949.34
Lces
1
3208
3208.9
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%