Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date2 Mar 2024
Closing Date15 Mar 2024
Tender Amount₹ 40,49,385.5 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 82,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Replacement Of Old And Heated Acsr Dog Conductor By New Acsr Dog Conductor
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL3_70746_1Bid Award Id
ViewTender No
EDC(USN)66/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General Instruction for Bidders
BOQ Items
Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in 33 KV Line.
100
-
-
Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual.
41
-
-
Erection of SP-72 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual.
10
-
-
Erection of Sp-55 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual
12
-
-
Erection of SP-72 double support pole in proper level and alignment along with fixing of all accessories like top channel,X bracings ,& clamps as per RESPO manual.
5
-
-
Erection of SP-55(11KV/33 KV)four pole support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual
2
-
-
Grouting of pole in size 0.45x4.45x1/9 of the support in CC ratio 1:4:8 (1 cement: 4 graded stone20 mm niminal size: 8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, levelling as per RESPO cnstruction manual.
99
-
-
Muffing of poles size 0.45x0.60 cm radius with 1:3:6 (1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement, stone and sand etc.
99
-
-
Painting of SP-55 pole with angle and channel and all steel part by one coat of Red Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level.
387
-
-
Fixing of triangular type bracket on 33 KV line
133
-
-
Laying, Spreading, Stringing and sagging of 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Dog as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and profile and sagging chart.
15.5
-
-
Guarding of 33 KV Line over (Telephone / Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guarding channel/ angle as per RESSPO manual.
20
-
-
Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line.
15
-
-
Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 0-20 Km)
79
-
-
Cartage of ST pole SP-72 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 0-20 Km)
20
-
-
Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends (distance 0-20 Km)
350
-
-
Headload cartage of SP-55 Pole from road to site(distance 1-3 Km)
79
-
-
Headload cartage of SP-72 Pole from road to site(distance 1-3 Km)
20
-
-
Headload cartage of small material (distance 1-3 Km)
425
-
-
Dismantling of 33 kv line(panther/dog)
15.5
-
-
Straightning of Tilted STP Poles
40
-
-
Erection of Sp-55 Tri Pole support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual
2
-
-
Back Carriage of Scrap Material
14815
-
-
Annexure - B (Supply )
-
-
-
Supply of Holding Clamp for SP-55 with N/B
200
-
-
Supply of Nut & Bolts
150
-
-
Supply of Stay Clamp for SP-55 with Nut and Bolt
100
-
-
Supply of Number Plate with Clamp
250
-
-
Supply of Bracing Clamp Bottom SP-55 with N/B
191
-
-
Supply of Danger Board
250
-
-
Supply of PG Clamp Dog to Dog
684
-
-
Supply of Earth Clamp STP SP-33/55/72 Pole with Nut & Bolt
250
-
-
Supply of Eye Bolt size 100x16
160
-
-
Supply of Barbed Wire
400
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements