Power Transmission Corporation Of Uttarakhand Limited Tender

View complete overview of Uttarakhand PTCUL Tender

Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender

Works
Eprocure
Opening Date15 Oct 2020
Closing Date3 Nov 2020
Tender Amount₹ 5,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Tightening of all CTs/CVTs & PTs, isolators and circuit breakers clamps/connectors of 220 KV ,132 KV and 33 KV bays in switch yard and replacement of damaged and brunt clamps/connectors and attending leakage (if any).

66

-

-

... More
Replacement of brunt and melted Jaw and Blades of all 220 KV, 132 KV and 33 KV Isolators alongewith checking and adjusting of proper alingnment including 220 KV and 132 KV Tendam isolators.

3

-

-

... More
Checking and adjesting of proper alingnment of 220KV, 132 KV and 33KV earth link of isolators.

3

-

-

... More
Cleaning/Painting after Rubbing/scrubbing of rusted CTs Top cover then one coat of primer and one coat of synthatic enamel paint on them including other misc. works.

51

-

-

... More
Servecing/Overhauling of operating mechanishm of 132 KV circuit breaker CB No. 71 & CB No. 74 and TBC CB No. 75 in switch yard including replacement of defective parts, greasing of moving parts,checking of all control wiring of respective circuit breakers at switch yard alongwith checking of operations from control panel and checking of tripping / closing assembly and replacement of faulty contactor relay, limit switch, TB and wiring of them. after that checking of operation and indication at control room etc.

3

-

-

... More
132 KV Sub-station Jaspur

-

-

-

... More
Tightening of Jumper of 132 KV and 33 KV Bus bar's in switch yard including work of replacement of damaged/brunt jumpers clamps and connectors. (Material will be provided by Deptt.)

2

-

-

... More
Tightening of both 40 MVA transformers bushing clamps/ deteriorated clamps and replacement of damaged/ brunt/ deteriorated clamps of Transformer and attending of minor oil leakage from valves of each transformer.

2

-

-

... More
Tightening of all CTs/CVTs & PTs, isolators and circuit breakers clamps/connectors of 132 KV and 33 KV bays in switch yard and replacement of damaged and brunt clamps/connectors and attending leakage (if any).

125

-

-

... More
Replacement of brunt and melted Jaw and Blades of all 132 KV and 33 KV Isolators along with checking and adjusting of proper alingnment including 132 KV and 33 KV tandem isolators.

2

-

-

... More
Checking and adjesting of proper alingnment of 132 KV and 33KV earth link of isolators.

2

-

-

... More
Servecing/Overhauling of operating mechanishm of 132 KV circuit breaker CB No. 71 & CB No. 73 in switch yard including replacement of defective parts, greasing of moving parts,checking of all control wiring of respective circuit breakers at switch yard alongwith checking of operations from control panel and checking of tripping / closing assembly and replacement of faulty contactor relay, limit switch, TB and wiring of them. after that checking of operation and indication at control room etc.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.