Pey Jal Nigam Uttarakhand Tender

View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender

Pey Jal Nigam Uttarakhand Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date24 Feb 2024
Closing Date8 Mar 2024
Tender Amount₹ 40,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
20 mm dia - GI (M)

600

-

-

... More
25 mm dia - GI (M)

1000

-

-

... More
32 mm dia - GI (M)

2991

-

-

... More
40 mm dia - GI (M)

1000

-

-

... More
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajari and boulders and rest 25% will be in medium rock

-

-

-

... More
Soil mixed with boulder (SMB)

1431

-

-

... More
Medium Rock (MR)

477

-

-

... More
Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete

-

-

-

... More
25 mm dia

2

-

-

... More
40 mm dia

2

-

-

... More
Supply of all materials,labours ,T.&P. etc. and making ferrule connection to provide FHTC to the consumers from existing w/s scheme including all material, labour, T&P etc. complete excluding water meter & pipe as per instruction given by Engineer - In-charge.

2

-

-

... More
Constructing Wheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.

4

-

-

... More
Construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, with supply of all materials Labour, T&P etc and construction of RCC CWR of following capacities (in kiloliters) with M.S. ladder outside & inside of the tank, M.S. M.H. Cover with locking arrangement, supply and fixing of outlet, inlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting on tank body vertical pipes, ladder, M.S. M.H. cover etc. complete with approved water proofing (apex)/enamel paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8 MT/M2

-

-

-

... More
10.00KL

1

-

-

... More
Supply cartage and fixing of Bucket type chlorinator of 25 Liter capacity at top of service raservoirs.

1

-

-

... More
Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.

1

-

-

... More
Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.

1.5

-

-

... More
R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials, labours, T&P etc. complete for proper completion of work.

20.28

-

-

... More
R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.

16.88

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.