Doiwala Sugar Company Limited Tender

View complete overview of Uttarakhand Doiwala Sugar Company Limited Tender

Doiwala Sugar Company Limited Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date26 Apr 2024
Closing Date10 May 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.C.C Work in 1:1.1/2:3 Cement Coarse sand 2 Cm stone shingle/Grit including supply of all material labour, T&P etc. including centering and shuttering.

3

-

-

... More
M.S Tor steel in reinforcement including supply of all material labour T&P etc. Required for proper completion of the work.

6

-

-

... More
Disposal of excavated earth /Malva/lime slakar with in 1 Km distance as directed by E/I

30

-

-

... More
50 mm Thick CC floor 1:2:4 cement Coarse Sand, Stone single/grit including supply of all material labour T&P etc.

450

-

-

... More
Dismantiling old and Wornout Plaster

200

-

-

... More
Repairs to plaster of Thickness 12 mm To 20mm on Patches area including supply of all material labour T&P etc. Required for Proper Competition of the Work

100

-

-

... More
12 mm Thick plaster in 1:4 including supply of all material labour T&P etc

250

-

-

... More
S/F of galvanized corrugated iron roof and side cleading 24 BWG old/new GCI sheet imposition including supply of all material 10 mm Dia J/L Hook of U bolt lump. Bitumen washer of approved quality but excluding cost of GCI Sheet provided by the factory.

350

-

-

... More
White washing two coat including supply of all material labour T&P etc.

3500

-

-

... More
Dismantiling old and Wornout heavy size iron work such as truss , purlins etc. upto 15 Mtr. Hight including supply of all material labour T&P etc. Required for Proper Completitionof the Work

1

-

-

... More
M.S Work in heavy Size Fabrication and erection such as purline and gutter labour T&P etc.but excluding cost of S.Steel provided by the factory.

1

-

-

... More
C.C Work in 1:2:4 Cement coarse sand and 2 cm stone single including supply of material labour T&P etc up to 6 Mtr height

14

-

-

... More
Snowcem work of approved quality two coat as per PWD specification including all material labour T&P etc.

4600

-

-

... More
Oil bond Distemper two coat including supply of all material labour T&P etc.

2525

-

-

... More
Painting or varnishing in Iron work or wood work two coat including supply of material labour T&P etc.

200

-

-

... More
Providing pocket holes in foundation as per Drawing including cost of material Size 100 x 75 MM

10

-

-

... More
Dismantling of old floor. Up to 50mm

220

-

-

... More
Dismantling of old floor. 50mm to 100mm

220

-

-

... More
Dismantling of GCI/A.C. sheets including labour T & P required for proper completion of work upto 15 Mtr height.

450

-

-

... More
First class brick work 1:6 in super structure above plinth level up to floor v level in all shapes and sizes in cement motar 1:6 cement and coarse sand including supply of all materral labour T & P etc. (Except cost of bricks) required for proper completion of the work.

8

-

-

... More
Same as item No. ‘23’ above but including cost of bricks.

3

-

-

... More
S/F A.C Sheets 6 mm thick grey corrugated asbestas sheet (Charminar Make). including supply of all material labour,hook,bolt,Nut washer T & P etc. reuqired for the proper completion of the work and includion wastage.

200

-

-

... More
Scraping oil boild distemper snowcem and lime or colour wash surface including material labour T & P etc.

1650

-

-

... More
S/F of G.C.I. roof and side cleading 22 BWG inposition. Including supply of all material 10 mm Dia J/L hook, U Bolt, Bitumin and Lumpirwasher of approved quality. Upto 15 Mtr Height

200

-

-

... More
Supply and laying Asian/Berger make Damp Proof Double Coat on Leakage roof after cleaning the roof surface. Including supply of all material Labour T & P etc. required for proper completin of the work.

450

-

-

... More
Earth Work in Excavation by JCB machine. Including all labour, fuel, machine etc. required for proper completion of the work.

10

-

-

... More
Earth filling in Road, foundation etc. with watering ramming and leveling. Including supply of all material labour T & P etc. required for proper completion of the work.

10

-

-

... More
Demolishing R.C.C. work manually. Incuding stacking of steel bars and disposal of unserviceable material with in the upto 1 Km lead as per direction of E/I

4

-

-

... More
Cleaning of drain near cane carrier to bullock cart gate boundary wall and disposal of unserviceable material with in upto 1 Km lead as per direction of E/I

1

-

-

... More
Providing, Hoisting and fixing Precast R.C.C. Slab1:2:4. Including cost of required shuttering and centering but excluding the cost of peinforcement required for proper completion of the work.

6.4

-

-

... More
52mm thick cement concrete flooring with concrete hardner topping under 50mm thick cement concrete1:2:4 and top layer 12mm thick cement hardner consisting of mix 1:2. Including supply of all material labour T & P etc. required for proper completion of the work.

250

-

-

... More
Fixing G.C.I. Sheet, Including supply of hook, bolt nut, washer, labour T & P etc above 10 mtr height except cost of G.C.I. sheets. Including dismantling sheet.             10’ Long G.C.I. Sheet

1

-

-

... More
Fixing G.C.I. Sheet, Including supply of hook, bolt nut, washer, labour T & P etc above 10 mtr height except cost of G.C.I. sheets. Including dismantling sheet.           5’ to 8’ G.C.I. Sheet

1

-

-

... More
Supply and fixing A.C. Sheets 6mm thickness including supply of all material labour T & P etc above 10 Mtr height including dismantling sheet. 10’ Long A.C. Sheet

1

-

-

... More
Supply and fixing A.C. Sheets 6mm thickness including supply of all material labour T & P etc above 10 Mtr height including dismantling sheet.     5’ to 8’ Long A.C.Sheet

1

-

-

... More
Tiles work in flooring Size 2’ x 2’ Supply of all material, labour T & P etc

30

-

-

... More
Tiles work in flooring Size 1’ x 1’ Supply of all material, labour T & P etc

20

-

-

... More
Tiles work in walls Size 12” x 18” Supply of all material, labour T & P etc

25

-

-

... More
Tiles work in walls Size 10” x 15” Supply of all material, labour T & P etc

30

-

-

... More
P.O.P. Work in Roof (Ceiling)

20

-

-

... More
Fall Ceiling in P.O.P Supply of all material, labour T & P etc

20

-

-

... More
Wooden Work in Doors & Window Ply wood peneld & glazed including the cost of all fitting

20

-

-

... More
Ist Class Brick Work in Foundation & Plinth

5

-

-

... More
Brick Flroring with sand including C.C. base 50 mm thick

5

-

-

... More
RBM Supply & Filling in Foundation, Road

80

-

-

... More
M.S. Work in heavy size fabrication and erection work such as purline and gutter labour T & P etc. Including supply of all material labour T&P etc. Up to 15 Mtr Height

5

-

-

... More
S/F Ply wood false celling. Including supply of all material labour T&P etc. required for proper completion of the work.

54

-

-

... More
75 x 75 mm cement sand gola in joint of parpit wall & roof. Supply of all material, labour T & P etc

50

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.