Uttar Pradesh State Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh State Industrial Development Authority - UPSIDA Tender

Works
Eprocure
Opening Date11 Jun 2021
Closing Date28 Jun 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Mechanical compaction of earth to achieve 95 % proctor density including necessary roller & POL etc.

867

-

-

... More
Construction of Granular Sub Base by Providing Coarse Graded Material, spreading in uniform layers with motar grader on preapared surface, mixing mix in place method with Rotavator at OMC, and compacting with Vabratory Roller to achieve the desired Density complete as per Clause No - 401 and also supply of all material labour and T&P etc as required for proper completion of the work.

173.4

-

-

... More
Providing, Laying, Spreading and Compacting Graded Stone Aggregateto Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/ base course on well preapared surface and compacting with Vibratory Roller to achieve desired density and also supply of all material labour and T&P etc as required for proper completion of the work.

130.05

-

-

... More
Providing and laying 75 mm thick Bituminous Macadam with 100-120 TPH Hot Mix Plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with Bituminous binder @ 4.5 % of the mix, tronsported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clause 501.6 and 501.7 to achieve desired compaction, including tack coat & supply of all material, labour, T&P etc. as required for proper completion of the work.

65.03

-

-

... More
Providing and laying 40 MM thick Bituminous Carpet with 100-120 P TPH batch type HMP prouding an average output of 75 tonnes per hour using crushed aggregate of specified grading, premixed with Bituminous binder @ 5.40 to 5.60 percent of mix and filler, tronsporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem roller, to achieve required compaction as per MORTH Specification Clause no -509 including tack coat , complete in all respect, including supply of all material, labour, T&P etc. as required for proper completion of the work.

45.9

-

-

... More
Providing and laying hot applied thermoplastic compound 2.50 mm thick including reflactorising glass beads @ 250 gms per SqM area thickness of 2.50 mm is exclusive of surface applied glass beads as per IRC : 35. The finish surface is to be level, uniform and free from streacks and holes as per MORTH Specification no. 803.

52.02

-

-

... More
Earth work in excavation in ordinary soil (loam, clay, or sand) including lift up to 1.50 m and lead up to 30.00 m and also including filling watering and ramming of excavated earth. in to foundation trenches or in to the space between building and sides of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer In charge up to a distance of 50.00 m from foundation trenches as required for proper completion of the work as in P.W.D. S.I. No.251

214.2

-

-

... More
Plain Cement Concrete with 40 mm gauge approved stone ballast, approved coarse sand and cement in the proportion of 10:5:1 including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.

35.7

-

-

... More
M-150 Brick work in 1:6 with cement and coarse sand mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.

90.44

-

-

... More
25 mm thick Plain Cement Concrete with cement , approved coarse sand & 20 mm gauge approved stone grit in the proportion of 1:2:4 with 3 mm thick floating coat of neat cement without base concrete including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.

119

-

-

... More
Struck Pointing with cement and sand of 1.5 F.M. mortar in 1:2 including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.

238

-

-

... More
Flush Pointing with cement and sand of 1.5 F.M. mortar in 1:2 including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.

272

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.