Uttar Pradesh State Bridge Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Bridge Corporation Limited - UPSBC Tender
Eprocure
Opening Date1 Aug 2019
Closing Date8 Aug 2019
Tender Amount₹ 9,02,54,859
Costs
EMD
₹ 18,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UPSBC_368940_1Bid Award Id
ViewTender No
326/E-Tender/CPM(CKT)/2019-20 Dt 30.07.2019Tender Authority
Uttar Pradesh State Bridge Corporation Limited ViewPurchaser Address
-Website
http://https://bridgecorporationltd.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and Fixing of Mild Steel liner for Well Curb and Steining complete as per Drawing and Technical Specification. (Mild Steel liner in pieces shall be provided by UPSBC free of cost)
135.75
-
-
M-35 grade Reinforced cement concrete in well foundation excluding cost of cement & Superplasticizer as per drawings and clause 1200, 1500 & 1700 of MoRT&H specification in Well Curb (cement & Superplasticizer shall be provided by UPSBC free of cost)
695
-
-
M-30 grade Reinforced cement concrete in well foundation excluding cost of cement & Superplasticizer as per drawings and clause 1200, 1500 & 1700 of MoRT&H specification in Well Steining (cement & Superplasticizer shall be supplied by UPSBC free of cost)
5600
-
-
M-30 grade Reinforced cement concrete in well foundation excluding cost of cement & Superplasticizer as per drawings and clause 1200, 1500 & 1700 of MoRT&H specification in well False Steining (cement & Superplasticizer shall be supplied by UPSBC free of cost)
120
-
-
M-25 grade plain cement concrete with 10 percent extra cement in well foundation excluding cost of cement as per drawings and clause 1200, 1500 & 1700 of MoRT&H specification in Bottom Plug (cement shall be supplied by the UPSBC free of cost)
2750
-
-
M-25 grade plain cement concrete in well foundation excluding cost of cement as per drawing and clause 1200, 1500 & 1700 of MoRT&H
specification in Intermediate Plug (cement shall be supplied by the UPSBC free of cost)
220
-
-
Back filling of dredged out material in wells complete as per drawing and clause 1207 of MoRT&H
specification.
5540
-
-
M-30 grade reinforced cement concrete in well foundation excluding cost of cement & Superplasticizer as per drawings and clause 1200, 1500 & 1700 of MoRT&H specification in Well Cap (cement & Superplasticizer shall be supplied by the UPSBC Ltd. free of cost)
1430
-
-
Sinking of 10.50m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock complete as per drawings and clause 1200 of MoRT&H specification. Depth of sinking recorded from actual cutting edge level recorded jointly before actual execution of the works including rectification of tilt & shift, if any.
206
-
-
Straightening, Cutting, bending and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications (Tor Steel
shall be supplied by the UPSBC free of cost)
380
-
-
M-40 grade reinforced cement concrete in sub structure (Pier, Pier Cap, Abutment Column & Top Beam etc.) excluding cost of cement & Superplasticizer as per drawings and clause 1200, 1500 & 1700 of MoRT&H specification (cement & Superplasticizer shall be supplied by the
UPSBC free of cost)
2440
-
-
Straightening,Cutting, bending and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications (Tor Steel
shall be supplied by the UPSBC free of cost)
260
-
-