Uttar Pradesh Projects Corporation Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Projects Corporation Limited - UPPCL Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Feb 2024
Closing Date22 Feb 2024
Tender AmountRefer Documents
Costs
EMD
₹ 67,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPPRC_898057_5Bid Award Id
ViewTender No
21/PM-10/UPPCL/2023-24Tender Authority
Uttar Pradesh Projects Corporation Limited ViewPurchaser Address
-Website
http://http://upprojects.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.
77.86
1504
117101.44
... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.
80.01
3420
273634.2
... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete
34.22
5225
178799.5
... More
Providing & Laying of Polythence sheet 125 micron thick before laying the C.C. Road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P
722.16
19
13721.04
... More
P.C.C. with 20mm stone grit with approved Coarse sand and cement in the porportion of 1:2:4 I/e supply of all material labour T&P etc. Required for propar complation of work
76.12
5225
397727
... More
Making expansion/construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c. road slab by full depth form at header joint and one thire depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc.
237.18
52
12333.36
... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.
133
128
17024
... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)
1.14
6270
7147.8
... More
M.S. work in RCC
1.34
8455
11329.7
... More
Fixing of sign board & photography
1
6175
6175
... More
from Ramji Yadav House to Sripal House in Village Barbai- Site clearence
1
4750
4750
... More
Earth work in embankment b y cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete.
250.92
194
48678.48
... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.
82.22
1010
83042.2
... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.
83.73
3420
286356.6
... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete
23.61
5225
123362.25
... More
Providing & Laying of Polythence sheet 125 micron thick before laying the C.C. Road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P
783.91
19
14894.29
... More
P.C.C. with 20mm stone grit with approved Coarse sand and cement in the porportion of 1:2:4 I/e supply of all material labour T&P etc. Required for propar complation of work
114.62
5225
598889.5
... More
Making expansion/construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c. road slab by full depth form at header joint and one thire depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc.
254.84
52
13251.68
... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.
97.62
128
12495.36
... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)
0.68
6270
4263.6
... More
M.S. work in RCC
0.81
8455
6848.55
... More
Fixing of sign board & photography
1
6175
6175
... More
S from Baladu Atikhar House to Canal Side in Village Tinduhi- te clearence
1
4750
4750
... More
Earth work in embankment b y cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete.
259.9
194
50420.6
... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.
76.21
1196
91147.16
... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.
78.35
3420
267957
... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete
34.79
5225
181777.75
... More
Providing & Laying of Polythence sheet 125 micron thick before laying the C.C. Road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P
708
19
13452
... More
P.C.C. with 20mm stone grit with approved Coarse sand and cement in the porportion of 1:2:4 I/e supply of all material labour T&P etc. Required for propar complation of work
74.63
5225
389941.75
... More
Making expansion/construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c. road slab by full depth form at header joint and one thire depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc.
237.18
52
12333.36
... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.
138
128
17664
... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)
0.98
6270
6144.6
... More
M.S. work in RCC
1.15
8455
9723.25
... More
Fixing of sign board & photography
1
6175
6175
... More
GST Extra as per applicable
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements