Uttar Pradesh Projects Corporation Limited Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Uttar Pradesh Projects Corporation Limited - UPPCL Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 Feb 2024
Closing Date22 Feb 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.

79.34

1045

82910.3

... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.

81.92

3420

280166.4

... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete

39.88

5225

208373

... More
Providing & Laying of Polythence sheet 125 micron thick before laying the C.C. Road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P

729.6

19

13862.4

... More
P.C.C. with 20mm stone grit with approved Coarse sand and cement in the porportion of 1:2:4 I/e supply of all material labour T&P etc. Required for propar complation of work

72.11

5225

376774.75

... More
Making expansion/construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c. road slab by full depth form at header joint and one thire depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc.

243.2

52

12646.4

... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.

153.54

128

19653.12

... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)

1.03

6270

6458.1

... More
M.S. work in RCC

1.21

8455

10230.55

... More
Fixing of sign board & photography

1

6175

6175

... More
from Kashiram Colony to Aareti in BichChhu Pahadiya- Site clearence

1

4750

4750

... More
Earth work in embankment b y cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete.

277.35

194

53805.9

... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.

80.29

1095

87917.55

... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.

81.75

3420

279585

... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete

23.18

5225

121115.5

... More
Providing & Laying Paver block interlocking road in 80mm average tickness including all cost of material and labour work complete in all respect.

764.52

798

610086.96

... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.

53.88

128

6896.64

... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)

0.8

6270

5016

... More
M.S. work in RCC

0.94

8455

7947.7

... More
Fixing of sign board & photography

1

6175

6175

... More
from Sri Narendra Singh House to Chandukhari Pond in Village Bidawar- Site clearence

1

4750

4750

... More
Earth work in embankment b y cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete.

238.02

194

46175.88

... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.

76.35

1504

114830.4

... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.

78.46

3420

268333.2

... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete

33.58

5225

175455.5

... More
Providing & Laying of Polythence sheet 125 micron thick before laying the C.C. Road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P

708

19

13452

... More
P.C.C. with 20mm stone grit with approved Coarse sand and cement in the porportion of 1:2:4 I/e supply of all material labour T&P etc. Required for propar complation of work

74.63

5225

389941.75

... More
Making expansion/construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c. road slab by full depth form at header joint and one thire depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc.

233.64

52

12149.28

... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.

130.6

128

16716.8

... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)

1.41

6270

8840.7

... More
M.S. work in RCC

1.34

8455

11329.7

... More
Fixing of sign board & photography

1

6175

6175

... More
GST Extra as per applicable

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.