Uttar Pradesh Projects Corporation Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Projects Corporation Limited - UPPCL Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Feb 2024
Closing Date22 Feb 2024
Tender AmountRefer Documents
Costs
EMD
₹ 66,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPPRC_898057_1Bid Award Id
ViewTender No
21/PM-10/UPPCL/2023-24Tender Authority
Uttar Pradesh Projects Corporation Limited ViewPurchaser Address
-Website
http://http://upprojects.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.
79.34
1045
82910.3
... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.
81.92
3420
280166.4
... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete
39.88
5225
208373
... More
Providing & Laying of Polythence sheet 125 micron thick before laying the C.C. Road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P
729.6
19
13862.4
... More
P.C.C. with 20mm stone grit with approved Coarse sand and cement in the porportion of 1:2:4 I/e supply of all material labour T&P etc. Required for propar complation of work
72.11
5225
376774.75
... More
Making expansion/construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c. road slab by full depth form at header joint and one thire depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc.
243.2
52
12646.4
... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.
153.54
128
19653.12
... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)
1.03
6270
6458.1
... More
M.S. work in RCC
1.21
8455
10230.55
... More
Fixing of sign board & photography
1
6175
6175
... More
from Kashiram Colony to Aareti in BichChhu Pahadiya- Site clearence
1
4750
4750
... More
Earth work in embankment b y cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete.
277.35
194
53805.9
... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.
80.29
1095
87917.55
... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.
81.75
3420
279585
... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete
23.18
5225
121115.5
... More
Providing & Laying Paver block interlocking road in 80mm average tickness including all cost of material and labour work complete in all respect.
764.52
798
610086.96
... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.
53.88
128
6896.64
... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)
0.8
6270
5016
... More
M.S. work in RCC
0.94
8455
7947.7
... More
Fixing of sign board & photography
1
6175
6175
... More
from Sri Narendra Singh House to Chandukhari Pond in Village Bidawar- Site clearence
1
4750
4750
... More
Earth work in embankment b y cartage of earth from 1.00km by tractor tralley including ramming dressing and watering complete.
238.02
194
46175.88
... More
Stone dust filling in blanket coat including supply of necessary qty of stone dust, ramming dressing, watering complete.
76.35
1504
114830.4
... More
P.C.C. with 40 gaug G.S.B. with approved Coarse sand and cement in the porportion of 1:6:12 I/e supply of all material labour T&P etc. Required for propar complation of work.
78.46
3420
268333.2
... More
M-150 brickwork in 1:4 cement and fine sand mortor including cost of material, labour, T&P complete
33.58
5225
175455.5
... More
Providing & Laying of Polythence sheet 125 micron thick before laying the C.C. Road for making separation with base coat concrete and prevention of pumping I/e supply of all material labour T&P
708
19
13452
... More
P.C.C. with 20mm stone grit with approved Coarse sand and cement in the porportion of 1:2:4 I/e supply of all material labour T&P etc. Required for propar complation of work
74.63
5225
389941.75
... More
Making expansion/construction joint and transverse or longitudinal contraction joint in interval of 3 mtr each in c.c. road slab by full depth form at header joint and one thire depth saw cuts on other joint with cleaning and sealing with Asphalt I/e supply of all material labour T&P etc.
233.64
52
12149.28
... More
12mm thick plaster work in 1:4 brick work minimum thickness not less then 10mm with cement and fine sand of 1.25 F.M. Mortor.
130.6
128
16716.8
... More
RCC work in 1:1.5:3 cement c sand and 20mm stone grit in slab (patiya)
1.41
6270
8840.7
... More
M.S. work in RCC
1.34
8455
11329.7
... More
Fixing of sign board & photography
1
6175
6175
... More
GST Extra as per applicable
-
-
-