Uttar Pradesh Power Transmission Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Eprocure
Opening Date25 Sep 2024
Closing Date7 Oct 2024
Tender AmountRefer Documents
Costs
EMD
₹ 8,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
E. Tender No. 23 V.p.m. (sha) / 24.25 Construction Of 01 No. 33 Kv Bay At 132 Kv Sub-station
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPTCL_959433_1Bid Award Id
ViewTender No
Short Term E. Tender No. 23ETC(S)/2024-25Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender Document, Details for EMD, Tender Cost Copy of UTR No and Pay in Slip of Transfer of Money through RTGS or NEFT, Experience etc. as per NIT
BOQ Items
33 KV Line Isolator
1
-
-
33 KV Bus Isolator
2
-
-
36 KV CT 200-100/A with junction box
3
-
-
36 KV PT with junction box
3
-
-
Dismantling of 2 No. CCM & 1 No. CGM structure alongwith sorting, counting and shifting of dismanteled materials from switchyard to store/suitable place at S/S.
1.03
-
-
Installation of 02 Nos. ABT Meter and metering cubicle with all cable laying & termination.
1
-
-
Laying of following size of control cable in the cable trench from control & relay panel to various equipment in switchyard as per cable schedule its saddling at every 75mm distance with SM saddles of size 25x3mm size including carriage of cable drums form store to laying site and shifting of remaining cables back to store and all other associated works to complete the job.
-
-
-
2Cx2.5 Sq.mm.
1000
-
-
4Cx2.5 Sq.mm.
1500
-
-
6Cx2.5 Sq.mm.
1000
-
-
Termination of control cable of various euipment with switchyard to control panel and drilling of holes in control panel and junction box & circuit breaker complete with cable glands, ferrules and other associated works to complete the job.
100
-
-
Dismantling of all three phase of Twin Moose ACSR conductor of 33 KV Main Bus (Length-15 Mtr.) along with opening of Jumpers, Tension fittings, 70 KN Disc insulator string etc completely, opening of connections of gantry with safety of men and materials and shifting of dismanteled material from switchyard to store including the cost of all required labour, T&P including the cost of all required labour, T&P etc.
1
-
-
Laying, Tensioning & Stringing of all three phase of 33KV Main Bus having section length 18 Mtr. With Twin ACSR moose conductor alongwith fixing of suitable Bolted type Tension fittings, Making of Insulator string by jointing 70 KN Disc Insulator as per standard practice.
1
-
-
Laying, Tensioning & Stringing of all three phase of 33KV Trasfer Bus having section length 6 Mtr. With Single ACSR Panther conductor alongwith fixing of suitable Bolted type Tension fittings, Making of Insulator string by jointing 70 KN Disc Insulator as per standard practice.
1
-
-
Jumpering of various equipments i.e CT, PT, ISOLATOR, CB, main bus etc with ACSR Panther conductor to equipments & Bus Bar to equipments including measuring,cutting of conductor & shifting of all other associated material from store to work site.
1
-
-
2 Point earthing of structure & equipments by digging of 0.7 meter deep trench in earth from equipments to sub-station earthmat which includes providing, cutting,welding and bending of MS flat as well as shifting of all other associated material from store to work site. All materials will be provided by the contractor.
-
-
-
25x6mm
100
-
-
50x6mm
300
-
-
Painting of Earthing strip (R. Mtr.) with one coat red oxide 2 coat paint with green ISI paint including vertical support.All materials to be provided by contractor.
-
-
-
25x6mm
100
-
-
50x6mm
300
-
-
Carraige of structure through private truck from EFU Naini, Prayagraj to 132 KV S/S Neri alongwith sorting, shifting and loading at Naini and unloading and stacking at 132 KV S/S Neri, Sitapur:-
-
-
-
Sorting out and stacking of Main & auxiliary structure as per BOM at EFU Naini
5.91
-
-
Loading of structure on private truck at EFU Naini
5.91
-
-
Transportation of structure from EFU Naini to 132 KV S/S Neri, Sitapur (Distance approx 350 Km.)
5.91
-
-
Unloading and proper stacking of structure at 132 KV S/S Neri, Sitapur as per BOM.
5.91
-
-
Pilfer proofing of the cable with G.I. pipe of followng sizes complete with cutting, bending & fixing of pipe alongwith making threads, elbow and other required material from 33 KV CT & PT in switchyard to energy meter in control room.All materials labour and T&P to be provided by the contractor.
-
-
-
G.I. pipe 2 " Dia
140
-
-
G.I. pipe 1 " Dia
90
-
-
Supply of PG Clamp duly made of LM-6 Aluminum alloy suitable for ACSR Moose to Panther conductor complete with 04 Nos. 16x90mm sisze GI Bolts & Nuts & spring/plain washers as per sample.
6
-
-
Supply of PG Clamp duly made of LM-6 Aluminum alloy suitable for ACSR Panther to Panther conductor complete with 04 Nos. 16x90mm sisze GI Bolts & Nuts & spring/plain washers as per sample.
15
-
-
Supply of Single tension fitting for ACSR Panther Conductor.
7
-
-
IEC 61850 based SCADA configuration & its integration with 33 KV bay. Work includes SLD generaion for feeder bay in existing HMI, bay IED 's ICD files configuration data base creation for new bay, event, alarm generation, interlocks & soft logics, configuration, testing, GPS time synchronisation for proper operation of all equipments through SCADA & BCU.
1
-
-
Supply of Fibre Optical Cable (6 fibre) suitable for communication between LIU to LIU of SAS system.
220
-
-
Supply of fibre Optical Multinode patch cords for ST-MTRJ Ports (each 3/5 Meter)
10
-
-
Supply of Fibre Optical Multinode patch cords for LC-LC ports (each 10 Meter).
5
-
-
Supply of Fibre Optical Multinode patch cords for ST-ST ports (each 10 Meter).
5
-
-
Hot dip galvanized, Hexagon round hexagon head Nut bolts, 'U' Bolts for main & auxiliary structure as per BOM of required structure.
220
-
-
Fee for electrical safety to be paid by contractor for obtaining 'No objection Certificate' from office of Electrical safety U.P. Govt. Lucknow before charging of New 01 No. 33KV Independent feeder bay (M/s Saga Ventures Pvt. Ltd.) at 132KV S/S Neri, Sitapur.
1
-
-