Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date12 Nov 2024
Closing DateCancelled
Tender Amount₹ 15,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 (13.2mm & 11.20mm in 2:1) mm aggregates either using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.(including bitumen but excluding GST)

600

190

114000

... More
Providing and laying seal coat sealing 6.7mm stone grit @0.009 cum per sqm the voids in a bituminous grade VG-10 @0.65kg per sqm surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510.(including bitumen but excluding GST)

600

67

40200

... More
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant,dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

135

8150

1100250

... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from ROW with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

60

56

3360

... More
PART A Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.

0.2

-

-

... More
1st year- maintainance cost 0% bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

-

-

... More
2nd year- maintainance cost 1.50 % bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

13740

2748.15

... More
3rd year- maintainance cost 3.00 % bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

27481

5496.3

... More
4th year- maintainance cost 4.50% bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

41222

8244.45

... More
5th year- maintainance cost 6.00 % bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

54963

10992.6

... More
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.

0.3

-

-

... More
1st year- maintainance cost 0% CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.3

-

-

... More
2nd year- maintainance cost 0.25 % CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.3

10556

3166.88

... More
3rd year- maintainance cost 0.50 % CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.3

21112

6333.75

... More
4th year- maintainance cost 0.75 % CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.3

31668

9500.63

... More
5th year- maintainance cost 1.00 % CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.3

42225

12667.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.