Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Feb 2025
Closing Soon5 Mar 2025
Tender Amount₹ 37,00,000
Costs
EMD
₹ 3,70,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMBD_1011433_3Tender No
7709/E-Nivida-MBD Circle/24-25 DT 09-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Brick edging on both sides of the road of first class (M-150) brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge. SI No 765 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
0.81
69500
56295
... More
Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.
2430
35
85050
... More
Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with Hydraulic burmer incliding as per Tecnical Specification clause 503. and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.
2430
15
36450
... More
P/L of open graded premix carpeting of 20mm thick composed with 13.2 mm to 5.60mm grit aggregate or approved graded grit @ 0.27 cum/10Sqm. using bitumen (VG-10) @ 146.00 Kg./100Sqm. as bearing course, including heating of bitumen to required temperature, and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T. Tecnical Specification clause 508
2430
178
432540
... More
Providing and applying seal coat type ‘C’ with 2.36 mm gauge stone grit @ 0.90 cum/100 Sqm & bitumen (VG-10) 65 kg/100 Sqm including heating of bitumen to required temperature, mixing of stone grit with suitable mixol, laying and rolling with a smooth wheeled roller and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.
2430
65
157950
... More
Excavation in foundation in ordinary soil (loan, clay or sand) including lift up to 1.5 m and lead up to 30m and including filling waterning and ramming of excavated earth in to the trenches or in to the space in to the building and the side of foundation tranches.3 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.
15
110
1650
... More
Plain cement concrete with 4cm guage stone ballast and fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floors and incliding supply of all meterial T&P and labour cess etc. as per direction of Engineer in charge.required for proper completion of the work. SI No- 281 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.
1.5
5750
8625
... More
Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm. Thickness including local sand, in ratio 2:1 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.
4
1100
4400
... More
M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.
7
5150
36050
... More
Supply and laying & fixing NP-3, 350mm dia hume pipeand including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.
15
1500
22500
... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of the fine sand of 1.25 finenes modulus on brick work and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T.
25
170
4250
... More
Concrete with 2 cm guage stone grit instead 4cm guage stone ballastof fine sand of 1.25 F.M and cement in proportion of 1:2:4 in foundation and under floors and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T. (SI No- 279 A)
0.2
6700
1340
... More
Mantinance Part A @ 7.50 %
-
-
-
... More
Maintenance of constructed Bituminous road next five year after completion the contractor shall be paid total maintenance cost 7.5% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)
For 1st Year 0.00%
3387850
-
-
... More
Item No. 17 but for 2nd year 0.75%
3387850
-
25408.88
... More
Item No. 17 but for 3rd year 1.50%
3387850
-
50817.75
... More
Item No. 17 but for 4th year 2.25%
3387850
-
76226.63
... More
Item No. 17 but for 5th year 3.00%
3387850
-
101635.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%