Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil Works Buildings
Eprocure
Opening Date26 Jun 2020
Closing Date3 Jul 2020
Tender Amount₹ 11,09,565 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,15,000Document Cost
₹ 860Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CEUCZ_487371_1Bid Award Id
ViewTender No
787/8 Lekha/2020-21 Dt. 18-06-2020Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Local shifting of pantoon with in 500m with help of crain etc.
72
-
1100
Dragging of pantoon from dry bed to river water and making pair & anchoring them with down stream side of river.
36
-
2540
Carrying of pantoon pair from the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing of the same with other pantoon pair and refixing the same in bridge alignment.
36
-
900
Carrying & laying of sal sleapar
1785
-
29
Carrying & laying of sal edging
240
-
14
Carrying & laying of R.S. joist (5.00m long) including loading, unloading, cost of carriage from central store and placing on the as per direction of E/I.
300
-
57
Fixing of railing post in position including making hole etc. complete.
208
-
33
Fixing of railing wire through hole of railing post and hole of vartical post and making wire stay of each rows and tightened with the help of stay clamps including making of hole in vertical ballies post (labour only). (375x2x3)=
2250
-
0.85
Repaying of chaquered plate after making camber by spreading of local sand as per direction of E/I.
1400
-
23
Making barrier on both side of pantoon bridge with billes (labour only)
4
-
415
Fixing of Wooden Anchor
60
-
346
S/o Large boats with mallah
25
-
555
Providing and erection of phoos huts for maintenance of pantoon bridge (12x10) Feets with leveling & dressing.
2
-
12000
Const. of approach road up to Teer Ka Purwa (Naubasta Ghat) Majre- Khaurauli. As per S.O.R.
1000
-
80
Const. of Pile culvert (Labour only)
200
-
318
Opening of the M.S. plate and Nut Bolt from chequered plate (labour rates only)
90
-
8.9
Dismantling of Chequered plate and lifting of chequered plate and loading into truck including cost of carriage, loading, unloading, T&P and duly stacked in store.
1400
-
55.5
Dismantling of carriage of the sal sleeper from bridge site to store site including loading, unloading and stacking etc. complete.
1785
-
27
Dismantling of carriage of the sal edging from bridge site to store site including loading, unloading and stacking etc. complete.
240
-
14
Dismantling of carriage of the R.S. joist (5.00 m length) from bridge site to store site including loading, unloading and stacking etc. complete.
300
-
55
Dismantling of carriage of the Railing post from bridge site to store site including loading, unloading and stacking etc. complete.
208
-
27
Extraction of 10mm dia wire rope wire from railing post and making roll.
2250
-
0.85
Different material such as nut and bolts, wire rope, P.P. rope etc.
25
-
69
Cartage of pantoon after dismantling from bridge site to store place including haulage of the pantoon upto river bank, disconnecting the pantoon loading, unloading with the help of crane labour, T&P etc.
72
-
3700
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements