Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Nov 2024
Closing Date23 Nov 2024
Tender Amount₹ 17,10,000
Costs
EMD
₹ 1,71,000Document Cost
₹ 854Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_973720_12Bid Award Id
ViewTender No
1312/Nivida/24 dated 05.11.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Mord
1500
72
108300
... More
Earth work in embankment and Patri in ordinary soil, including lift upto 1.5 mt and lead upto 30 mtr and also including ramming and dressing the surface to required level and slope as per direction of E/I.
225
110
24750
... More
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405.(for CC)
15
4350
65250
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,
65
9230
599950
... More
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5m. (5fts.) and lead upto 30m. (100fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30m. (100 fts.) from the foundation trenches. as per SOR
48
110
5280
... More
Providing and laying in Cement concrete 1:4:8(1cemeent:4find sand :8 graded brick ballast 40mmnominal size) and curingcomplete,including cost of formwork in foundation and floors. As per SI No-275
14
4350
60900
... More
Class-150 brick work in 1:4 Cement and coarse sand mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work. As per SOR 305b
20
5390
107800
... More
Cement Concrete with 20 mm grit 1:2:4 Cement,C Sand & Stone Grit
12.5
7850
98125
... More
12 mm thick cement plaster with cement, mortar of 1:3 cement & coarse sand of 2.25 fm .As per SI 583
190
215
40850
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance cost (0.00% on Civil Cost Item no 1-5) (FOR PC work)
1
-
-
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance cost (1.5% on Civil Cost Item no 1-5) (FOR PC work)
1
8543
8543
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd Year Maintenance cost (3.00% on Civil Cost Item no 1-5) (FOR PC work)
1
17087
17087
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance cost (4.5% on Civil Cost Item no 1-5) (FOR PC work)
1
25630
25630
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance cost (6.00% on Civil Cost Item no 1-5)
1
34173
34173
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance cost For CC Work (0.00% on Civil Cost Item no 06-12) (FOR CC work)
1
-
-
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance cost (0.25% on Civil Cost Item no 06-12) (FOR CC work)
1
2445
2445
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd Year Maintenance cost (0.50% on Civil Cost Item no 06-12) (FOR CC work)
1
4891
4891
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance cost (0.75% on Civil Cost Item no 06-12) (FOR CC work)
1
7336
7336
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance cost (1.00% on Civil Cost Item no 06-12) (FOR CC work)
1
9782
9782
Evaluation Notes How It Works ?
Potential Partner