Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date27 Nov 2024
Closing Soon2 Dec 2024
Tender Amount₹ 22,10,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels , grade and cross fall using Type'C' as per Technical Specification Clause 510 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

90

59

5328

... More
PART B Maintainance cost :- Maintainance cost will be paid year wise as per prevailing Government order No. 17/2024/SA-113/23-1-2024-23-1099/113/2023 date 16.01.2024.Maintainance cost will adjusted as per final cost of constrction and will be paid accordingly

1

-

-

... More
1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

-

-

... More
2nd year - maintainance cost 1.5% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

596

596.14

... More
3rd year - maintainance cost 3.00% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

1192

1192.29

... More
4th year - maintainance cost 4.5% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

1788

1788.43

... More
5th year - maintainance cost 6% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

2384

2384.57

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 KN in stages to proper grade and camber, applying and brooming, binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. WBM Grading-3 as per Technical specification Clause 405 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

45

2812

126576

... More
Construction of joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

135

7860

1061221.5

... More
Construction of Subgrade and earthen shoulders with approved material obtained from R.O.W. with all lift and leads, spreading grading to required slope and compacted to meet requirement of Tables 300.2 as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

90

61

5553

... More
Earth work in excavation of foundation of structures as per drawing and technical specification clause 305.1, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

117.39

137

16082.05

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per technical specification cluase 802, 803, 1202 & 1203

17.3

6922

119722.91

... More
Brick Masonry Work in Cement Mortar 1:4 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. 1300

74.88

6109

457427.26

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204

60.65

6588

399604.8

... More
Plain cement concrete 1:2:4 nominal mix in foundation with crushed stone aggregate mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per technical specification cluase 802, 803, 1202 & 1203

8.65

7265

62856.78

... More
R.C.C. grade M-25- Providing and laying reinforced cement concrete in super stuctture as per drawing and technical specification clause no-800,1205.4 abd 1205.5

9.34

8545

79845.85

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications No-1000 & 1200

1.28

79709

101893.29

... More
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications

62.88

73

4590.24

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm wit smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall return wall to the full height compacted to firm condition complete as per drawing and technical specification clauses 1204.3.8

15.12

2110

31903.2

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

1.08

185

199.8

... More
Provinding and laying plaster blocks 30x30 cm with cement and coarse sand in proportion of 1:3

0.72

185

133.2

... More
Disposal/cleaning of sewage/ garbage etc. from old culvert and near by drain before staring the construction work.

1

20000

20000

... More
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of POL

50

110

5500

... More
PART B Maintainance cost :- Maintainance cost will be paid year wise as per prevailing Government order No. 17/2024/SA-113/23-1-2024-23-1099/113/2023 date 16.01.2024.Maintainance cost will adjusted as per final cost of constrction and will be paid accordingly

1

-

-

... More
1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

-

-

... More
2nd year - maintainance cost 0.25% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

6232

6232.77

... More
3rd year - maintainance cost 0.50% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

12465

12465.55

... More
4th year - maintainance cost 0.75% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

18698

18698.32

... More
5th year - maintainance cost 1% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

24931

24931.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.