Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date30 Oct 2024
Closing Soon3 Dec 2024
Tender Amount₹ 54,00,000
Costs
EMD
₹ 4,70,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_969935_4Tender No
4120/183-Com-Vns Circle/2024-25 Dated 16-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(45.0-63mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-2 as per Technical Specification clause 405. (Including all taxes, Labour Cess but excluding GST )
365
3040
1109600
Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405. (Including all taxes, Labour Cess but excluding GST )
365
3210
1171650
Brick edging on both side of road with first class brick 8 cm. (3”) wide 12 cm. (4.50”) deep laid with mud mortar including all materials, lab our, T & P etc. complete. (Including all taxes, Labour Cess but excluding GST )
1.3
78000
101400
Providing and applying primer coat with bitumen emulsion (SS-II) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means as per Technical Specification Clause 502. (Including all taxes, Labour Cess but excluding GST )
4875
36
175500
Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Air compresser as per Technical Specification Clause 503. (Including all taxes, Labour Cess but excluding GST )
4875
15
73125
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm -11.2 mm aggregates using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with three wheel static roller 80-100 KN capacity ,finished to required level and grades to be follwed by seal coat of Type -C as per Technical Specification Clause 508. (Including all taxes, Labour Cess but excluding GST )
4875
178
867750
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Including all taxes, Labour Cess but excluding GST )
4875
64
314437.5
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (Including all taxes, Labour Cess but excluding GST )
17.5
19
341.25
Concrete with 4cm. gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work. (Including all taxes, Labour Cess but excluding GST )
1.72
4400
7550.4
M-150 brick work in 1:4 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. (Including all taxes, Labour Cess but excluding GST )
6.08
5600
34020
Laying RCC Hume pipes 350 mm dia NP-3 inculiding collars/ spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 find sand) including testing of joints..(Including all taxes, Labour Cess but excluding GST )
15
1600
24000
Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work. (Including all taxes, Labour Cess but excluding GST )
12.46
185
2305.1
PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
1
-
-
1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
1
-
-
2nd year - maintainance cost 0.75% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
1
35087
35087.06
3rd year - maintainance cost 1.5% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
1
70174
70174.11
4th year - maintainance cost 2.25% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
1
105261
105261.17
5th year - maintainance cost 3% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
1
140348
140348.23
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%