Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Eprocure
Opening Date15 Feb 2024
Closing DateCancelled
Tender Amount₹ 2,28,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, Laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. for Reconstruction of Chacora to Kai Mustakam Road

125

481250

3850

... More
Providing, Laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. for Reconstruction of Chachora to Marora Road

55

214500

3900

... More
Providing, Laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. for Reconstruction of Paurara to Sirsa and Sirsa to Kalan Road

35

134750

3850

... More
Providing, laying, spreading and compacting of graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. for Reconstruction of Chacora to Kai Mustakam Road

510

4080000

8000

... More
Providing, laying, spreading and compacting of graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. for Reconstruction of Chachora to Marora Road

750

6037500

8050

... More
Providing, laying, spreading and compacting of graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. for Reconstruction of Paurara to Sirsa and Sirsa to Kalan Road

600

4800000

8000

... More
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. (bitumen issued departmentaly if available) including loading, unloading and cartage upto site as per Schedule C attached) for Reconstruction of Chacora to Kai Mustakam Road

5100

73950

14.5

... More
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. (bitumen issued departmentaly if available) including loading, unloading and cartage upto site as per Schedule C attached) for Reconstruction of Chachora to Marora Road

7500

108750

14.5

... More
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. (bitumen issued departmentaly if available) including loading, unloading and cartage upto site as per Schedule C attached) for Reconstruction of Paurara to Sirsa and Sirsa to Kalan Road

6000

84000

14

... More
Providing, laying and rolling of open-graded premix carpet (HMP) of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 Grade Bitumen bitumen to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Type B seal coat as per technical Specification Clause 508 (bitumen issued departmentaly if available) including loading, unloading and cartage upto site as per Schedule C attached) for Reconstruction of Chacora to Kai Mustakam Road

5100

790500

155

... More
Providing, laying and rolling of open-graded premix carpet (HMP) of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 Grade Bitumen bitumen to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Type B seal coat as per technical Specification Clause 508 (bitumen issued departmentaly if available) including loading, unloading and cartage upto site as per Schedule C attached) for Reconstruction of Chachora to Marora Road

7500

1162500

155

... More
Providing, laying and rolling of open-graded premix carpet (HMP) of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 Grade Bitumen bitumen to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Type B seal coat as per technical Specification Clause 508 (bitumen issued departmentaly if available) including loading, unloading and cartage upto site as per Schedule C attached) for Reconstruction of Reconstruction of Paurara to Sirsa and Sirsa to Kalan Road

6000

918000

153

... More
Providing and laying seal coat by mechanical means (HMP) with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 but excluding GST. (bitumen issued departmentaly if available) including loading, unloading and cartage upto site as per Schedule C attached) for Reconstruction of Chacora to Kai Mustakam Road

5100

260100

51

... More
Providing and laying seal coat by mechanical means (HMP) with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 but excluding GST. (bitumen issued departmentaly if available) including loading, unloading and cartage upto site as per Schedule C attached) for Reconstruction of Chachora to Marora Road

7500

375000

50

... More
Providing and laying seal coat by mechanical means (HMP) with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 but excluding GST. (bitumen issued departmentaly if available) including loading, unloading and cartage upto site as per Schedule C attached) for Reconstruction of Reconstruction of Paurara to Sirsa and Sirsa to Kalan Road

6000

300000

50

... More
Construction of un-reinforced plain cement concrete pavement, 15 cm thickness as per design over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 Grade coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side frame work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the framework as per drawing), spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continious operation including provision of contraction and expansion, construction joints by providing 12mm thick dura board at the specified spacing, applying debonding strips primer, sealant near approaches to bridge/culvert and construction joints admixtures as approved, curing of concrete slabs for 14-days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 but including cost of polythene sheet but including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. for Reconstruction of Chacora to Kai Mustakam Road

180

1386000

7700

... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M, and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M from the foundaiton trenches. (SI. No. 251) but excluding GST. for Reconstruction of Chacora to Kai Mustakam Road

100

11000

110

... More
Concrete with 4cm Gauge stone ballast coarse sand of 1.25 F.M and cement in proportion of 8:4:1 in foundation and under floors (SI. No. 281) but excluding GST. For Reconstruction of Chacora to Kai Mustakam Road

20

115000

5750

... More
R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. Binding wire of supplied by the contractor free of cost including making of drip coarse. (SI No. 283) but excluding GST. for Reconstruction of Chacora to Kai Mustakam Road

42

315000

7500

... More
Mild steel or TMT Bars(Fe-500D grade or higher) or HYSD Bars or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel. (SI No. 504) but excluding GST. for Reconstruction of Amroha Chacora to Kai Mustakam Road

21

172200

8200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.