Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Date11 Nov 2024
Tender Amount₹ 60,00,000
Costs
EMD
₹ 5,00,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMBD_970500_1Bid Award Id
ViewTender No
5562/ETEN_RC/24_25_D_27_10_24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion (SS-2) in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. (Including all T&P, Labour, Material, RoyaltyTax but excluding GST)
510
7100
3621000
Brick edging on both sides of the road of first class (M-150) brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge. (Including all T&P, Labour, Material, Tax but excluding GST)
1.7
65500
111350
Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer/Bituminous surface as per Technical Specification Clause 503. (Including all T&P, Labour, Material, Tax but excluding GST)
5100
12
63750
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 (By Mechanical Means). (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
5100
159
810900
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 ( By Mechanical Means) (Including all T&P, Labour, Material, Royalty Tax but excluding GST)
5100
55
280500
First Year Maintainance (@0% of Total Work Amount of S.No. 1 to S.No.08)
1
-
-
Second Year Maintainance (@0.75% of Total Work Amount of S.No. 1 to S.No.08)
1
52471
52471.88
Third Year Maintainance (@1.50% of Total Work Amount of S.No. 1 to S.No.08)
1
104943
104943.75
Fourth Year Maintainance (@2.25% of Total Work Amount of S.No. 1 to S.No.08)
1
157415
157415.63
Fifth Year Maintainance (@3% of Total Work Amount of S.No. 1 to S.No.08)
1
209887
209887.5