Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Executive Engineer Construction Division-l, P.W.D., Aligarh SCHEDULE 'C' The followings materials shall be issued to the contractor against his specified demands supported by indents and ifavailable on demand at P.W.D. store issue mtes and place supported specified against each item. Department is not bound to supply the materials ifnot available with the Department and no claim for extra payment due to non supply or delay of materials shall be entertained. Condition of Issue ln case the contractor has taken materials in excess ofthe schedule requirement to worked out as stated above the cost ofmaterials issued in excess shall be deducted at punitive mte which will be 50% higher than the stock issue rate for that month, while in the case lesser consumption the cost of the difference in materials shall be deducted at stock issue rate. Contractors arc advised to take materialsjust to meet their requirements to avoid deduction at punitive mte. The Contractor shall provide as safe stomge for the material issued to him by the department. He is responsible for their proper watch and ward. All the materials lifted from the store must go to the site of work only. All place of the stores ofthe Contmctor where the materials are stored shall remain open for inspection by P.W.D. staffwhenever required. Any material other than provided above in the schedule 'C' will be issued to the contractor on demand, ifavailable, at stock issue rate or the market rate which ever is higher. In case of non availability of the materials shown in the schedule 'C' the contractor will not be allowed any claim in this account, however suitable extension of time will be granted provided documentary proofofthis effect is supplied by the conractor. The Account of Bitumen should be maihtained by the contmctor or register issued by the department and the same shall be produces as and when the officer concemed demanded. b. d. Signature of Contractor Junior Engineer C.D.-1, P.W.D., Aligarh Assistant Engineer C.D.-1, P.W.D., Aligarh Executive Engineer Cp.-1. P.W.D.. Aligarh 1r>- No. Name of Material Rate of Issue Unit Location from where to be lssued I Bulk Bitumen V.G.-30 Per M.T. P.W.D., Divisional Store At C, D.- I , Alisarh 2 Bulk Bitumen V.G.-l0 27668.00 Per M.T. 3 Emulsion M.S. Per M.T. -As Above- 4 Emulsion S.S.-2 Per M.T. 5 c.R.M.B.-55 Per M.T. -As Above- 6 Empty Mobile oil Drum/Bitumen Drum Per No

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.