Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Nov 2024
Closing Date23 Nov 2024
Tender Amount₹ 23,50,000
Costs
EMD
₹ 2,35,000Document Cost
₹ 854Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_973720_8Bid Award Id
ViewTender No
1312/Nivida/24 dated 05.11.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per SI 280
19
6660
126540
... More
Class-150 brick work in 1:4 Cement and coarse sand mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work. As per SOR 305b
36
5390
194040
... More
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work SI 279b
3
7350
22050
... More
12 mm thick cement plaster with cement, mortar of 1:3 cement & coarse sand of 2.25 fm .As per SI 583
250
190
47500
... More
R.C.C. work with cement approved coarse sand and 2cm (3/4'') gauge approved srone ballast in the proportion 1:1.5:3 (1Cement: 1.5 coars sand 3 aggregate) in slab excluding supply of reinforcement and its bending but including its fixing and binding the same necessary with 24BWG binding wire and including necessary centering and shuttering etc. and also including supply of materials labour and tools and plants etc. required for proper completion of the work, SI N0 284b
4
8650
34600
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping & hooks.SI 504
0.3
7500
2250
... More
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405.(For PC Portion)
20
4450
89000
... More
Providing and applying tack coat with BitumenVG-10 using bitumen distributor at the rate of 0.25 kg. per Sqm on the prepared old nonbituminous surfaces treated with Hydraulic broom as per Technical Specification Clause 503 also including cost of bitumen , labour T&P etc. required for proper completion of the work as per direction by Engineer In charge.
2400
12
28800
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness compesed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be following by Seal Coat of either Type-C as per Technical Specification Clause 508 Mord.
2400
206
494400
... More
Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Mord
2400
72
172800
... More
Earth work in embankment and Patri in ordinary soil, including lift upto 1.5 mt and lead upto 30 mtr and also including ramming and dressing the surface to required level and slope as per direction of E/I.
400
110
44000
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance cost (0.00% on Civil Cost item no 1 to 9)
1
-
-
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance cost(0.25% on Civil Cost item no 1 to 9)
1
3346
3346
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd Year Maintenance cost(0.50% on Civil Cost item no 1 to 9)
1
6692
6692
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance cost(0.75% on Civil Cost item no 1 to 9)
1
10038
10038
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance cost(1.00% on Civil Cost item no 1 to 9)
1
13384
13384
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance cost (0.00% on Civil Cost item no 10 to 14)
1
-
-
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance cost(1.50% on Civil Cost item no 10 to 14)
1
12435
12435
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd Year Maintenance cost(3.00% on Civil Cost item no 10 to 14)
1
24872
24872
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance cost(4.50% on Civil Cost item no 10 to 14)
1
37305
37305
... More
The routine maintenance of above road work i/c embankment patri,pavement road sides and cross drains ,hume pipe culverts etc to the required standards and in the manner as defined in CB condition and keep the entire road surface in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance cost(6.00% on Civil Cost item no 10 to 14)
1
49740
49740