Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date5 Feb 2024
Closing Date13 Feb 2024
Tender Amount₹ 6,65,703
Costs
EMD
₹ 66,570Document Cost
₹ 1,416Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_890381_1Bid Award Id
ViewTender No
Ref.2890/Jal.Anu.-23-24/Deoria Date 03-02-24Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
1st class brick work in 1:6 cement and coarse sand mortar in superstructure including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1 brick.
13.25
96114
7253.96
20 mm thick damp proof course with cement and approved course sand in 1:2 including 5% water proofing materials of in the proportion as specified for proper complition of the work and including curing and shuttering as necessary.
4.45
1168
262.67
R.C.C work with cement, coarse sand and 20mm gauge approved stone ballast in proportion of 1:15:3 in lintels of doors and windows,slab&chhaja excluding supply of reinforcement and its bending, but including its fixing and binding the same with 0.50mm thick binding wire(to be supplied by the contractor) and including centering and shuttering, supply of all materials, labour, T & P etc. required for proper completion of the work.
1
-
-
SLAB-Varandha
2.4
28083
11701.32
BEAM/LINTAL
0.6
7235
12058.82
CHHAJJA
0.4
4680
11701.32
Mild steel or iron work in plain work such as R.C.C. or R.B. work (when not included, in over all rates), wrought to required shape as necessary incluiding bending for proper completion of the work incluiding supply of steel and wastage.
305
28435
93.23
Supply & fixing of angle iron door chaukhat with shutter including fixing of holdfast, heavy duty hinges etc. complete
110
13113
119.21
Supply & fixing of angle iron window/ventilator chaukhat with grill and shutter including fixing of holdfast, heavey duty hinges etc complete
180
23603
131.13
12 mm thick plaster in 1:6 with cement and coarse sand mortar over brick work minimum thickness not to be less than 10 mm, including supply of all materials, labour, T. & P.etc. Required for proper completion of the work.
82.22
15800
192.17
12 mm thick plaster in 1:6 with cement and coarse sand mortar over rough face of one brick work minimum thickness not to be less than 10 mm, including supply of all materials, labour, T. & P.etc. Required for proper completion of the work.
53.26
11823
221.99
20mm thick plaster in dado or skirting in (1:2) consisting of cement and coarse sand laid in panels finished with 3mm floating coat of neat cement or 1:5 cement and marble dust including supply of all materials labour T & P etc required for proper completion of the work
5.49
2754
501.66
Sand filling in plinth including supply of necessary quantity of sand from A distance not exceeding 10 km. from the site of work and including watering, dressing, etc. Rate to include the cost of all materials, labour, T and P etc required for proper completion of the work.
12
14620
1218.35
25mm thick 1:2:4 plain cement concrete floor and appron with cement coarse sand and 20mm gauge stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio 1:5 as specified over and including 75mm thick base concrete consisting of cement local sand and 1st class brick ballast 40mm gauge in the proportion of 1:4:8 and removing any overlapping or mortar at the joints of panels if any and giving them uniform finish including supply of all materials labour and T and P etc. required for proper completion of the work.
26.38
16678
632.24
Painting or varnishing new iron work in small areas or new wood work with one coat priming and two coat of approved paint or varnish including supply of all materials, Labour and T & P etc required for proper completion of the work.
22.32
5255
235.45
Finishing wall with Asian Apex Ultima paint over one priming coat on new work with two coats, to give an even shade, including prepration of surface &supply of MM all matrials labour T&P etc. required for proper completion of the work.
92.4
9418
101.93
Supply and Fixing of Rolled steel joists complete.
1
9500
9500
Construction of by-pass chamber as per departental type & design including supply of all materials, labour N T&P etc. complete.
1
15900
15900
Supply of following sizes and type of pipe with coupler and all jointing materials such as solvent cement etc. including F.O.R. destination and all taxes. Insurance and with loading unloading and stacking etc. complete
1
-
-
100 mm Dia 3M long heavy duty pipe (M.S Pipe)
15
70500
4700
140mm Dia HDPE Pipe PN-6 Grade-PE-100
40
18040
451
Supply of the Specials for above HDPE Pipes 5% OF ABOVE ITEM
1
4427
4427
Exacavation for pipe line work is ordinary soil (loam, clay or sand) for pipe line trinches, including lift upto 1.50m & lead up to 50m & refilling watering, ramming of excavated earth into trenches and disposed of surplus earth up to 50m from centre
42.33
9778
231
Carting of the following sizes pipes and special from department store to site of work and lowering them in to trenches and laying true to alignment and gradient including testing of pipeline. But including all labour T&P etccompleat
for above PVC nine
1
-
-
100 mm Dia 3M long heavy duty pipe (M.S Pipe)
15
1170
78
140mm Dia HDPE Pipe PN-6 Grade-PE-100
40
3360
84
Dismantling of following type of surface including sorting out stacking of serviceable material and disposal of unserviceable materials upto a distance of 50m.
1
-
-
BOE.Surface.
1
-
-
Interlocking
1
-
-
Bituminus Surface.
1
-
-
CC Road.
1
-
-
Reinstatement of the following type of road surface with old and new materials including supply of all materials, labour T&P etc required for proper completion of the work.
1
-
-
BOE.Surface.
1
-
-
Interlocking
1
-
-
Bituminus Surface.
1
-
-
CC Road.
1
-
-
Interconnection for new pipe line to old pipe line including supply of all material, labour T& etc complete.
1
3000
3000
Add 18% GST
1
101547
101547.55
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements