Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Road Construction
Eprocure
Opening Date11 Oct 2024
Closing Date18 Oct 2024
Tender Amount₹ 8,41,145
Costs
EMD
₹ 84,115Document Cost
₹ 993Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_964467_20Bid Award Id
ViewTender No
1386/NPP/GARH-nivida nirman/2024-25Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Relaying of interlock tiles including levelling dressing surface on 30mm thick bed and filling joints with fine sand insluding cost of sand, labour etc comp. only labour rate ( old interlock tiles available at site ) new item.20.13/2022
300
110
33000
S/L of 80mm thick Rubber molded interlocking C.C. tiles (300mpa) leveling and dressing of surface to required proper level and slope with 4cm. Sand cusion & joints filled with local sand including supply of all materials all complete.
110
953
104918
P.C.C.(1:6:12) cement fine sand and brick Ballast in foundation and under floorsincluding supply of all materials labour tools and plants etc. required for proper completion of the work. s.i no 273/2022
8
4000
32000
M 150 (1:4) Brick work,cement and corase sand including supply of all materials labour T&P etc. required for proper completion of the work.303(a)/2022
13
5170
67210
12 mm thick plaster(1:4) with cement and fine sand minimum tick ness not to be less than 1 cm including supply of all material labour T&P etc. required for proper completion of the work.(586/2022)
98
185
18130
P.C.C.(1:2:4) cement concrete with 2 cm gauge approved stone grit including supply of all material, labour and t&p etc. s.i no 279 (a)/2022
12
7050
84600
M.S iron work of sma size and section such as holding down bolts tie rods grating channel etc. including s/o all mat lab t & p all comp including rivetting welding where necessary
14
8500
119000
R.C.C. Work with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra As in item 284/2022 above but in slabs
8
8580
68640
MS Tor In plain work such as RCC or R.B. work Including bending for proper shape and inclu- ding supply of steel and its wastage bend hooks, and authorized overlapping shall be measured and including cost of binding . s.i no 504
6.28
8324
52274.72
Earth work in filling including cartage upto 5 km. all complete (analysis rate )
70
283
19845
Cartage of surplus earth, malva/silt upto 3km all complete.(Analysis rate)
11
146
1608.2