Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Oct 2024
Closing Date18 Oct 2024
Tender Amount₹ 8,41,145 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Relaying of interlock tiles including levelling dressing surface on 30mm thick bed and filling joints with fine sand insluding cost of sand, labour etc comp. only labour rate ( old interlock tiles available at site ) new item.20.13/2022

300

110

33000

... More
S/L of 80mm thick Rubber molded interlocking C.C. tiles (300mpa) leveling and dressing of surface to required proper level and slope with 4cm. Sand cusion & joints filled with local sand including supply of all materials all complete.

110

953

104918

... More
P.C.C.(1:6:12) cement fine sand and brick Ballast in foundation and under floorsincluding supply of all materials labour tools and plants etc. required for proper completion of the work. s.i no 273/2022

8

4000

32000

... More
M 150 (1:4) Brick work,cement and corase sand including supply of all materials labour T&P etc. required for proper completion of the work.303(a)/2022

13

5170

67210

... More
12 mm thick plaster(1:4) with cement and fine sand minimum tick ness not to be less than 1 cm including supply of all material labour T&P etc. required for proper completion of the work.(586/2022)

98

185

18130

... More
P.C.C.(1:2:4) cement concrete with 2 cm gauge approved stone grit including supply of all material, labour and t&p etc. s.i no 279 (a)/2022

12

7050

84600

... More
M.S iron work of sma size and section such as holding down bolts tie rods grating channel etc. including s/o all mat lab t & p all comp including rivetting welding where necessary

14

8500

119000

... More
R.C.C. Work with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra As in item 284/2022 above but in slabs

8

8580

68640

... More
MS Tor In plain work such as RCC or R.B. work Including bending for proper shape and inclu- ding supply of steel and its wastage bend hooks, and authorized overlapping shall be measured and including cost of binding . s.i no 504

6.28

8324

52274.72

... More
Earth work in filling including cartage upto 5 km. all complete (analysis rate )

70

283

19845

... More
Cartage of surplus earth, malva/silt upto 3km all complete.(Analysis rate)

11

146

1608.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.