Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Eprocure
Opening Date3 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 67,89,310 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate)

296.47

1020153

3441

... More
Providing and laying wet mix macadem well graded material…..............................all complete. (As per Analysis of Rate)

76.25

277397

3638

... More
Providing and applying tack coat with bitumen (VG-10) at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per technicla specification clause-503 (As per Analysis)

2725

35697

13.1

... More
Providing and laying 50mm dense graded bituminous macadam with 100 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler,MORTH Specification clause 507complete in all respects.

30.5

340559

11165.9

... More
Providing and laying Bituminous concrete with 60-90 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggergates of specified graing, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the mix to work site, laying with a hydrostatic paver finisher with senser control to the required grade, level and alignment, rolling with smooth wheeler, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. (As per Analysis)

52.88

675441

12773.1

... More
P/L of hot applied thermoplastic compund 2.5 mm thick including trorising glass beeds @ 250 gm per sam area. Thickess of 2.5 mm in exclusive of surface applied glass beeds etc . ………… Including cost of all material, labour, T&P etc. require for proper completion of work as direction by E/I.

129

66435

515

... More
RCC work Providing and laying in position specified grade of reinforced cement concrete in raft foundation including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (CHAPTER-5 DSR/ PWD SI. No. 5.1)

2.4

17880

7450

... More
M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (Sl No. 504)

1.88

13084

6960

... More
Providing and laying 80 mm thick i-Shaped & zig-zag shaped grey interlocking tiles over 30 mm thick local sand base levelling and dressing of surface required level and slope, filling joints with local sand all complete.(As per Analysis)

1571.08

1233297

785

... More
Providing and laying 80 mm thick i-Shaped & zig-zag shaped coloured interlocking tiles over 30 mm thick local sand base levelling and dressing of surface required level and slope, filling joints with local sand all complete.(As per Analysis)

673.32

605988

900

... More
Proving and laying cement concrete in 1:2:4 with cement, coarse sand and 20mm guage stone aggregate, curing complete, including cost of form work.

9.69

62985

6500

... More
Supplying and Planting of trees well developed in poly bag of size 20cm as per direction of the officer-in-charge. ………………… including all complete.

256

38400

150

... More
Mild steel and iron work of small size and section such as holding down woods, hold fasts tierods, grating, etc. (When not included in and over all rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts if required for proper completion of work including fabrication of holes in door chaukhats and nosing. Grill for Plantation

6680

467600

70

... More
Supply and Fixing of MS/iron Tree guard ………………… including all complete. (As per Analysis of rate)

144

260352

1808

... More
Supply and fixing Manak board ……….. All Complete.(As per Analysis for rate)

1

4590

4590

... More
Construction of Inauguration / Silla patt board using brick work and granite stone ………….. All Complete.(As per Analysis for rate)

1

10380

10380

... More
Add 18 % G.S.T

1

1035685

1035685.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.